IBS BatchControl CTR 210 Installation Instructions Manual

Compact controller

Advertisement

Revision 1
Marie-Curie-Str. 8
50170 Kerpen
Germany
CTR 210 Montageanleitung nicht Ex 020 E.odt
Compact Controller
CTR 210
Installation Instructions
Tel.: +49 22 73 / 60 37 0
Fax. : +49 22 73 / 60 37 22
www.ibs-batchcontrol.de
05.10.2011

Advertisement

Table of Contents
loading

Summary of Contents for IBS BatchControl CTR 210

  • Page 1 Compact Controller CTR 210 Installation Instructions Revision 1 Marie-Curie-Str. 8 Tel.: +49 22 73 / 60 37 0 50170 Kerpen Fax. : +49 22 73 / 60 37 22 Germany www.ibs-batchcontrol.de 05.10.2011 CTR 210 Montageanleitung nicht Ex 020 E.odt...
  • Page 2 Only staff trained and authorised by the plant operator are allowed for usage. The CTR 210 is to be connected as specified in the electrical data. Do not open the housing, otherwise maintenance of the electrical data is not ensured and the guarantee expires immediately.
  • Page 3: Table Of Contents

    1. System Description...................4 1.1. Type Codes....................4 1.2. Areas of application...................4 1.3. Block Diagram...................5 2. Fitting and Installation..................6 2.1. Fitting the CTR 210...................6 2.2. Protection Class IP20................6 2.3. Temperature ranges..................6 2.4. Cable and PE....................6 2.5. Terminal assignment ................7 2.5.1. Power Supply 1..................7 2.5.2.
  • Page 4: System Description

    System Description 1. System Description The microprocessor-controlled CTR 210 are a simple to use controller or indicator in hazardous production areas. 1.1. Type Codes The following types can be supplied: Compact Controller Type Type for input 1-3 CTR 210 1 = mA, 2 = Pt100, 3 = mA-isolating transformer...
  • Page 5: Block Diagram

    System Description 1.3. Block Diagram...
  • Page 6: Fitting And Installation

    IP20. The front conforms IP54. 2.3. Temperature ranges The CTR 210 can be operated in the range –20°C to +60°C. 2.4. Cable and PE Only shielded cable may be used. The shield must be connected in the casing or the EMC clamps.
  • Page 7: Terminal Assignment

    Fitting and Installation 2.5. Terminal assignment The technical data in the Certificate of Conformance must be observed at all times. A CTR 210 may only be operated with the maximum values are observed. 2.5.1. Power Supply 1 The power supply provides power for all the electronics, the first analogue output and the digital inputs and outputs.
  • Page 8: Analog Input Pt100

    Fitting and Installation 2.5.4. Analogue input Pt100 Each input can be provided with a Pt100 input module as an option. Pt100-inputs are not voltage-free, i.e. the minus is at instrument ground potential. Terminal 1 + measuring input 1 Umax = 5,3 V Terminal 2 - measuring input 1 Imax = 2 mA...
  • Page 9: Analogue Output 2

    I = 4 - 20 mA Terminal 16 - current output 2 2.5.8. Digital inputs The CTR 210 has six digital inputs. The digital inputs are active. Passive switches or optical couplers can be connected. Terminal 19 + digital input 1...
  • Page 10: Digital Outputs

    Fitting and Installation 2.5.9. Digital outputs The CTR210 / BGI210 has six digital outputs. Umax = 36 V Terminal 26 + digital output 1 Terminal 27 - digital output 1 Imax = 500 mA Terminal 28 + digital output 2 Umax = 36 V Terminal 29 - digital output 2...
  • Page 11: Declaration Of Conformity

    Declaration of Conformity 3. Declaration of Conformity...