IBM System/370 145 Operating Procedures Manual page 49

Hide thumbs Also See for System/370 145:
Table of Contents

Advertisement

interval timer switch
14
introduction
7
I NTVN REQD indicator (PR"KB)
28
invalid address (PR-KB)
37
invalid character (PR-KB)
37
IPL
39
I P L error recovery
39
13
keys
PR-KB
27,28
system control panel
23
knobs, platen (PR-KB)
26
lamp (see indicators)
lamp test switch
14
levers (PR-KB)
copy control
26
forms load
26
impression control
25
ribbon I itt
25
ribbon load
25
lights (see indicators)
load indicator
11
load key
23
load unit address switches
20
lock key (PR-KB)
27
LOG PRES indicator
9
II
magnetic disk handling procedure
34
main storage address switches
20
main storage, alter/display (PR-KB)
36
MAN indicator
11
manual operations
CPU console store/display
floating-point registers
41
general-purpose registers
41
main storage
41
PR-KB alter/display
current PSW
36
floating-point registers
36
general-purpose registers
36
main storage
36
storage key
36
memory (see storage)
meters, use
file
45
system
21
II
not ready key (PR-KB)
29
m
operating procedures
alter/display
36
ASCP
42
automatic system checkout program
42
auxiliary console
40
clear storage
40
data compare trap
40
disk cartridge insertion and removal
34
emergency pull switch
39
EPa
39
IMPL
38
IMPL error recovery
38
initial microprogram program load
38
48
operating procedures (continued)
initial program load
39
instruction step
39
IPL
39
IPL error recovery
39
magnetic disk cartridge handling
34
manual store/display operations
41
power failure recovery
39
power off
39
power on
39
PR-KB manual operations
36
SEREP
44
set IC
39
system check error recovery
40
System Environment Recording and Editing Program
44
m
paper insertion (PR-KB)
30
platen (PR-KB)
knobs
26
removal
30
replacement
30
power failure recovery
39
power off
key
23
procedure
39
power on
key
23
procedure
39
printer controls (PR-KB)
25
print element (PR-KB)
cleaning
32
removal
31
replacement
31
printer-keyboards
24
PR-KB manual operations
36
procedures (see operating procedures)
proceed indicator (PR-KB)
28
II
rate switch
17
ready key (PR-KB)
29
request key (PR-KB)
29
request pending indicator
28
restart key
23
return key (PR-KB)
27
ribbon (PR-KB)
lift lever
25
load lever
25
replacement
29
roller switch
A-register display
13
display assembler out
12
rotary switches A through H
20
SEREP
44
set I C (instruction counter)
39
set IC key
23
set control storage address
23
shift key (PR-KB)
27
SNG ECC CHK indicator
9
spacebar (PR-KB)
27
start console file key
23
start key
23
status indicators, CPU
9

Advertisement

Table of Contents
loading

Table of Contents