Installation - Grundfos DPI Installation And Operating Instructions Manual

Grundfos differential pressure sensor, industry
Table of Contents

Advertisement

6. Installation

The sensor can be mounted direct on the side of the pump or on a wall by
means of the mounting bracket supplied.
Fig. 3
Connections of the DPI
The DPI cable has four leads:
1
12 - 30 V supply voltage
2
GND (earth lead)
3
Signal lead
Test lead (can be cut off during mounting). This
4
lead must not be connected to voltage supply.
The DPI must be supplied with power via a PELV supply
(EN 60335-1) where GND is connected to protective earthing.
Furthermore, connect the mounting bracket and/or one or
both of the capillary tubes to earth.
10
Brown
Yellow
Green
White

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents