Installing The Radio Link - Waeco PerfectView RV-FM-10 Installation Manual

Accessory, radio link
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17
_RV-FM-10.book Seite 23 Mittwoch, 11. Januar 2006 11:03 11
PerfectView
6

Installing the radio link

6.1
Tools required
For installation and assembly you require the following tools:
Drill bit set (fig. 1 1, page 2)
Drill (fig. 1 2, page 2)
Screwdriver (fig. 1 3, page 2)
Set of ring or open-ended spanners (fig. 1 .4, page 2)
Measuring ruler (fig. 1 5, page 2)
Hammer (fig. 1 6, page 2)
Centre punch (fig. 1 7, page 2)
For making and testing the electrical connection the following tools are re-
quired:
Diode test lamp (fig. 1 8, page 2) or voltmeter (fig. 1 9, page 2)
Crimping tool (fig. 1 10, page 2)
Insulating tape (fig. 1 11, page 2)
Cable bushing sleeves, if required
To fasten the modules and the cables, you may need additional screws
and cable binders.
6.2
Installing the modules
Warning!
Select the location of the modules so that they cannot injure the
passengers in the vehicle under any circumstances (e. g. sudden
braking, road traffic accidents).
Observe the following instructions during installation:
Select a suitable location protected from moisture within the vehicle.
The installation location should be flat.
Installing the radio link
23

Advertisement

Table of Contents
loading

Table of Contents