Pentair Hydromatic TG-Pro System Installation And Service Manual page 5

Complete grinder package offering
Table of Contents

Advertisement

Risk of electrical shock or
electrocution.
May
in serious injury or death or
fire hazard. To reduce risk of
electrical shock, do not connect
conduit to pump .
Internal Basin
Connections
Step 1:
If the system is supplied with a
float bracket, attach float switches to
the float bracket by clamping
strain relief bushings around the
float cords, then inserting and
twisting the bushings into the float
bracket slots.
Step 2:
After grinder pump attachments
have been made, lower the pump
FINAL BACKFILL FOR BASIN SYSTEMS
Polyethylene
unit down and ensure the ball check
valve sealing flange aligns and
connects properly with discharge.
result
Junction Box Systems:
Step 1:
Ensure power source is off or
dis con nect ed.
Step 2:
Push pump power, seal failure/heat
sensor, and float cords through
cord grips in the junction box and
tighten. To prevent corrosion or
electrical short, plug any unused
holes.
Step 3:
Remove junction box cover
and make all connections inside
junction box to all incoming
control panel wires.
Step 4:
It is recommended that the
customer furnish and install a
conduit seal outside the basin
to prevent surface water from
entering the junction box.
Electrical Connections:
NOTE:
Failure
to
Hydromatic approved control
panel voids the pump warranty
and guarantee.
IMPORTANT:
connect the panel ground wire
to a grounding rod. Improper
grounding voids warranty.
Panel Wiring:
Step 1:
Ensure power source is off or
disconnected.
Fiberglass
use
a
Properly
5

Advertisement

Table of Contents
loading

Table of Contents