Trane Axiom GWS Series Installation, Operation And Maintenance Manual page 33

Table of Contents

Advertisement

lifting hook and the top of the unit should be 7 feet.
N N O O T T I I C C E E
U U n n i i t t D D a a m m a a g g e e ! !
U U n n i i t t d d a a m m a a g g e e w w i i l l l l o o c c c c u u r r i i f f f f o o r r k k l l i i f f t t i i n n g g i i s s a a t t t t e e m m p p t t e e d d
o o n n c c e e t t h h e e p p a a l l l l e e t t h h a a s s b b e e e e n n r r e e m m o o v v e e d d . .
4. Test-lift the unit to ensure it is properly rigged and
balanced, make any necessary rigging adjustments.
5. Removal of the base pallet must be completed
before unit can be set. Prior to lifting the unit,
remove the 6 fork pockets from the base rails and 4
wood screws from the lifting lug corners. The unit
will then separate from the pallet when lifted.
6. Lift the unit and position it into place.
7. Downflow units; align the base rail of the unit with
the curb rail while lowering the unit onto the curb.
Make sure that the gasket on the curb is not
damaged while positioning the unit.
Figure 33. Rigging and center of gravity data 3 to 10
tons
WSHP-SVX015C-EN
Figure 34. Rigging and center of gravity data 12.5 to
20 tons
TOP CRATING
CENTER OF GRAVITY
LENGTH
U U n n i i t t W W e e i i g g h h t t s s
RIGGING
CENTER OF
GRAVITY WIDTH
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Axiom gws150–240Axiom gwsc036-120

Table of Contents