Cooker hood CPDD, CPDL - Installation and Maintenance Manual CONTENTS OPERATION AND MAINTENANCE (FOR USER) Cleaning of cooker hood ................. 3 Cleaning of grease filters ................. 3 Replacement of low energy lamp ............3 General information ..................3 Operation ......................4 CPDL - Setting of supply air temperature .........
Cooker hood CPDD, CPDL - Installation and Maintenance Manual OPERATION AND MAINTENANCE CLEANING THE COOKER HOOD Do not use abrasive sponge or cloth. NOTE! Do not use the cooker hood CLEANING OF GREASE FILTERS without the grease filters fitted. alt. Check the grease filters every week.
Cooker hood CPDD, CPDL - Installation and Maintenance Manual OPERATION AND MAINTENANCE OPERATING OF CPDD, CPDL Booster knob Lighting Fan speed adjustment knob NORMAL FläktGroup DC_8759GB_20190207_R1 We reserve the right to make changes without prior notice...
Cooker hood CPDD, CPDL - Installation and Maintenance Manual OPERATION AND MAINTENANCE CPDL - SETTING OF SUPPLY AIR TEMPERATURE (POSTHEATER) 1. Remove the lamp glass. 2. Use a screwdriver to set the supply air temperature downstream of the ventilation unit. The factory setting is 10 °C. Factory setting Min - Off 10°...
Page 6
Cooker hood CPDD, CPDL - Installation and Maintenance Manual OPERATION AND MAINTENANCE CPDL - SETTING OF SUPPLY AIR TEMPERATURE (POSTHEATER) 4. The indicator lights for the electric post-heater and defrosting functions are lo- cated in the cooker hood as shown in the figure above. If the yellow light is illuminated, the If the green light is illuminated, de- electric post-heater is in operation.
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDD FOR HEAT RECOVERY UNIT ACF All cooker hoods must be connected directly or indirectly via the heat recovery unit/extract air fan to earth. PROCEDURE Alt.
Page 8
Bakkant kåpa 3,2 mm Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDD FOR HEAT RECOVERY UNIT ACF, CONT’D. NOTE! The CPDD cooker hood does not have a power output indicator 8. Assemble the water trap as shown in the figure. light.
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDD FOR BAF TYPE EXTRACT AIR FAN PROCEDURE 1. Disconnect the unit from the power supply by pulling out the 8. Before installation, prepare the fire damper by fixing it with the included melting rivet (125 °C).
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) 10 mm CPCZ-07 INSTALLATION OF NIPPLES (ACF BEFORE 1988) PROCEDURE 4. Drill a hole with a diameter of 3.2 mm in the hood roughly 10 mm Bakkant kåpa behind the centre of the nipples.
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDL NOTE! INSTALLATION, COMMISSIONING AND ADJUSTMENT AS DESCRIBED IN THESE INSTRUCTIONS MUST BE CARRIED OUT BY QUALIFIED AND AUTHORISED PERSONNEL. Read the installation instructions in their entirety before starting work. 1.
Page 12
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDL - FAN SPEED SETTING (AIRFLOW) NOTE! This must be done before installing the new CPDL hood. 7. Remove the grease filter in the hood. (x7) 8.
Page 13
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDL - FAN SPEED SETTING (AIRFLOW), CONT’D. Transformer 9. Remove the safety plate in order to see and access the transformer. Transformer 10. Move the connection in the upper row to the position that corresponds to its position on the transformer in the old hood.
Page 14
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDL - FAN SPEED SETTING (AIRFLOW), CONT’D. 5-087-000073 11. The figure above shows the markings on the transformer in the CPDL in detail. Position 2 (115 V) to position 7 (190 V).
Page 15
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDL - TESTING OF POST-HEATING AND DEFROSTING FUNCTIONS Temperature OPERATION TEST sensor contact Jumpers 19. Cut the power supply to the cooker hood and disconnect the temperature sensor connector on the control board.
Page 16
Cooker hood CPDD, CPDL - Installation and Maintenance Manual INSTALLATION (FOR INSTALLER AND SERVICE PERSONNEL) CPDL - TESTING OF POST-HEATING AND DEFROSTING FUNCTIONS, CONT’D. OPERATION TEST Jumpers Running indication 21. Reconnect the temperature sensor connector to the control board, move the jumper back to OPERATING mode and switch on the power.
Cooker hood CPDD, CPDL - Installation and Maintenance Manual ADJUSTMENT (FOR INSTALLER AND SERVICE PERSONNEL) FORCED VENTILATION b = 5 a = 25 q, l/s ∆p FläktGroup DC_8759GB_20190207_R1 We reserve the right to make changes without prior notice...
Cooker hood CPDD, CPDL - Installation and Maintenance Manual REPLACEMENT PARTS COOKER HOOD CPDD, CPDF, CPDL Always cut the power before starting any work on the equipment. All work must be carried out by qualified personnel to avoid hazard. Compatible with cooker hood Pos.
Cooker hood CPDD, CPDL - Installation and Maintenance Manual DECLARATION OF CONFORMITY II A ENCLOSURE Declaration of Conformity In accordance with: EU Directive for Machinery, 2006/42/EC EU EMC Directive, 2014/30/EU EU RoHS Directive, 2011/65/EU Manufacturer FläktGroup Sweden AB Fläktgatan 1 551 84 Jönköping Herewith declares that: Product...
Cooker hood CPDD, CPDL - Installation and Maintenance Manual DISPOSAL DISPOSAL OF PRODUCTS AND PACKAGING MATERIALS Separate at source according to local regu- lations. Depending on the product, the fol- lowing should be removed when disposing of it: - Circuit boards, cables, coils, motors, sen- sors etc.
Page 24
WWW.FLAKTGROUP .COM CPDD, CPDL FläktGroup is the European market leader for smart and energy efficient Indoor Air and Critical Air solutions to support every application area. We offer our customers innovative technologies, high quality and outstanding performance supported by more than a century of accumulated industry experience.