English (US) Installation and operating instructions Original installation and operating instructions. Maintenance 10.1 Cleaning CONTENTS Accessories list Page Photos Disposal Limited warranty Symbols used in this document Warning General safety instructions Prior to installation, read these installation and Purpose of these operating instructions operating instructions.
Products manufactured by GRUNDFOS PUMPS CORPORATION 3.1 Purpose of these operating instructions (Grundfos) are warranted to the original user only to be free of These operating instructions inform about operating and defects in material and workmanship for a period of 24 months...
Immediately wash affected skin and clothing with 2000 ppm (2 g/l) is generated in the reactor. Hence the water. Oxiperm Pro OCD-162 operates far out of the range of critical concentrations. Warning Danger of explosion in case of overdosage: At a concentration of...
Page 5
3.8.3 Procedure in case of an emergency The general safety regulations and regulations for the procedure in case of an emergency apply. See NIOSH, OSHA, EN 12671 guidelines. Actions in case of an emergency: • Ventilate the installation location immediately. •...
The suction lance cables send low-level and empty signals to the controller. The Oxiperm Pro OCD-162 is connected to two water lines: • The potable water line for supplying dilution water and flushing water.
4.1 Application examples 4.2.2 Flow-rate-proportional dosing 1. The controller is set to "proportional controller". Oxiperm Pro OCD-162 disinfection systems can be used for different types of applications: 2. A contact water meter or flow meter measures the water flow rate in the main water line, and continuously sends measured 4.1.1 Disinfection of potable water lines...
4.3 Components of a standard system Blue Fig. 2 Components of a standard system (Oxiperm Pro OCD-162-5, -10)
Page 9
Analyzer and controller with plain text display main water line Sample water line to measuring cell (AQC) Sample-water extraction device Measuring cell (Grundfos AQC-D11) for checking the chlorine dioxide concentration in the main water line Power supply connection See the photos in section...
Page 10
Blue Fig. 3 OCD-162-5, -10 system with measuring cell and without extension module Fig. 4 Complete system with measuring cell (e.g. OCD-162-30, -60)
Page 11
Dosing line Injection unit for dosing chlorine dioxide (ClO ) into the main water line Sample water line Sample-water extraction device Grundfos AQC-D11 measuring cell Power supply connection/main switch Connection cable for measuring cell Sample-water drain Connection cable for cleaning motor...
Protective pipe for the ClO line, installed from the dosing pump to the injection unit. • Grundfos DIT photometer: measures the chlorine dioxide concentration after dosing and useful for system calibration. • Sample-water filter (in case of insufficient water quality).
Page 13
4.5.2 Oxiperm Pro OCD-162-30, -60 Fig. 6 Hydraulic connections OCD-162-30, -60 Pos. Description Tubing for both suction lances on the suction side of 5, 6 the NaClO and HCl dosing pumps Tube at the drain cock of the batch tank (only installed...
Selects the next menu item, or sets a Button [Down] The Oxiperm Pro OCD-162 is equipped with an electronic lower numerical value controller. The controller has connections for the following: Button [OK] Confirms the menu selection •...
Page 15
During operation, press [Esc] to access the display level: ..5 °C 23 mg/l pH 7 Fig. 9 "prod. running" display level The header indicates the status. The positions are explained in the table below. Legend Pos. Message Description "prod. running" Chlorine dioxide production is active.
Access is enabled for 60 minutes after entry of the code. 4.9.2 Service code This code is reserved for trained Grundfos service engineers. Access is enabled for 30 minutes after entry. The service code is necessary for initial startup.
Page 17
Submenu 2 Submenu 3 Submenu 4 Submenu 5 cal. meas. value [N/A] cal. result h/m3 µA, mg/l cal. cycle on/off GRUNDFOS, cal. meas. value DIN/NIST, others calibration slope µA, mg/l cal. result asym. mV cal. cycle on/off cal. meas. value cal.
5. Technical data 5.1 Identification 5.1.1 Type key Example: Type key Oxiperm Pro OCD-162-30-P/H3 Oxiperm Pro OCD-162 Max. Capacity 5 g/h 10 g/h 30 g/h 55 g/h Operation mode integrated mechanical dosing pump, DMX integrated Digital Dosing pump DDI integrated SMART Digital Dosing pump DDA...
Page 19
5.1.2 Nameplate OCD-162 5S/H3 162-005-10000 5/N: 07/64064 10, 11, 12 5g/h, 120V, 50/60Hz, 850Watt 95735155P1107380764064 Fig. 10 Nameplate (for OCD-162-5-S/H3) Pos. Description Type designation Product name Model Serial number Chlorine dioxide production capacity Product number Country of origin Year and week of production Marks of approval, NSF 61 PWT, ETL, CE mark, etc.
Page 21
OCD model Chlorine dioxide generator 162-5 162-10 162-30 162-60 Conforms to ANSI/UL Std. 61010-1 Electrical safety 4007209 Chlorine Dioxide Generator model numbers OCD-162-5, OCD-162-10, OCD-162-30 and OCD-162-60 are certified to NSF 61-2011 requirements found in clause 3.3.2. (a) These chemical generators are certified for use exclusively at public water treatment facilities.
5.3.1 Oxiperm Pro OCD-162-5 and OCD-162-10 30.11 in (765 mm) 19.68 in (500 mm) 12.92 in. (328 mm) Ø 0.41 in. (10.5 mm) Ø 0.41 in. (10.5 mm) Ø 0.41 in. (10.5 mm) Fig. 11 Dimensional sketch, Oxiperm Pro OCD-162-5 and OCD-162-10...
Page 23
5.3.2 Oxiperm Pro OCD-162-30 and OCD-162-60 30.16 in (766 mm) 22.36 in (568 mm) 25.98 in (660 mm) 19.69 in (500 mm) Ø 0.41 in (10.5 mm) 22.83 in (580 mm) Fig. 12 Dimensional sketch, Oxiperm Pro OCD-162-30/-60...
5.4 Weights and capacities 5.5 Permissible chemicals Nominal concentration of NaClO solution W x H x D 7.5 % by weight* Oxiperm Pro (quality according to EN 938) [in (mm)] Nominal concentration of HCl solution 30.12 x 30.16 x 13.00 9.0 % by weight* OCD-162-5, -10 (quality according to EN 939)
7. Transport and packaging 8. Installation Installation is described in detail in the separate Service Warning Instructions. This subsection can be used by the operating Increased risk of damage to equipment and company to plan installation. personal injury as a result of operating faults due to transport damage.
Store the manuals in authorized service personnel trained by a dry place where the operators may reference Grundfos. them as needed. Switch off the power supply before starting work. 2. Measure the pressure and temperature in the Carry out power supply connection according to dilution water line and in the main water line.
9. Operation 9.1.1 Adjusting the process (how many batches) To specify whether just one batch or several batches of chlorine All software menus can be selected from the "main menu" using dioxide is to be prepared, or whether the production process the [Up] and [Down] buttons, and accessed using [OK].
9.3 Terminating production and ClO dosing 9.4 Continuing production after an interruption 9.3.1 Terminating chlorine dioxide production 9.4.1 Continuing production after terminating chlorine dioxide production 1. "main menu > settings" > [OK]. During commissioning and in normal operation: Start chlorine settings dioxide production: start...
9.5 Flushing 9.5.1 Preparing to flush 1. Before starting to flush, have ready the following items: Warning – Empty 5 gallon (10 liter) plastic buckets (1 bucket for Risk of poisoning from chlorine dioxide gas. OCD-162-5, -10, -30, and 2 buckets for OCD-162-60) Do not mix sodium chlorite and hydrochloric –...
9.5.3 Starting flushing 9.5.5 Terminating flushing 1. Menu > Service > Process > Flushing The flushing process can be terminated any time using the [Esc] key. flushing 9.5.6 Responding to flushing faults put suct. lance into water [OK] It can take five minutes to rinse the pumps. If the following error message appears after five minutes, proceed as follows: 2.
9.7 Modifying setup 9.7.3 Setting the time 1. "main menu > commissioning" > [OK]. Setup is selected as follows: 2. "date/time" > [OK]. 1. "main menu > commissioning" > [OK]. 3. "time" > [OK]. 4. Press the [Up] or [Down] button to set the commissioning time, main menu confirm with [OK].
9.8 Monitoring the production and dosing process main menu service settings status list of events production flushing terminate start status l/min maintenance date age of ClO2 [N/A] HCl/NaClO ClO2 temperature measured value cal. logbook ctrl. parameters water meter temp. comp. relays level indicators [N/A]...
Page 34
9.8.1 Current measured values for ClO , water temperature pH value and pH/ORP 1. "main menu > service" > [OK]. 2. "[N/A]" > [OK]. The measured values in this menu are only displayed, if "[N/A]" has been enabled. [N/A] If the AQC-D6 measuring cell has been selected, ClO2 Note Note...
Page 35
ORP value 9.8.2 Current control parameters 1. "main menu > service" > [OK]. Not for applications with external batch tank. 2. "[N/A]" > [OK]. Parameters for the setpoint controller 1. "main menu > service" > [OK]. [N/A] 2. "ctrl. parameters" > [OK]. ClO2 Temperature ctrl.
Page 36
Parameters for the proportional controller 9.8.4 Process status 1. "main menu > service" > [OK]. 1. "main menu > service" > [OK]. 2. "ctrl. parameters" > [OK]. 2. "settings" > [OK]. 3. "status" > [OK]. ctrl. parameters y-out:....75 % int.
Page 37
9.8.6 Number of ClO batches 9.8.9 Indicating the "age of ClO2" in the reaction tank and in batch tank 1. "main menu > service > process > production". 1. "Main menu > Service > Process > Production ClO2". After 9999 batches, the display is reset to 0. production production batches...
9.9 Setting the warning relay and alarm relay main menu operation ClO2 alarm dos. time monit. max. dosing time lower limit upper limit hysteresis alarm delay [N/A] [N/A] Fig. 17 Structure of the "change container" menu "change container" is only visible, if "[N/A]" or a controller is activated, see "commissioning". "ClO2 alarm"...
9.10 Configuring the warning relay The factory setting is "[N/A]" If the alarm is to be triggered by a downward violation: The warning relay is activated whenever an alarm is signalled, and remains active until the alarm is confirmed (collective 3.
Page 40
9.10.2 Setting the hysteresis 9.10.5 Replacing a chemical container The hysteresis indicates the tolerance of the alarm value OCD-162-5, -10: Make sure that the chemical Note Note (alarm value ± 0.5 x hysteresis). In this menu, you set the containers are positioned under the system. hysteresis for the two alarm values: 1.
2. Empty signal HCl or NaClO Change the HCl or NaClO container. – ClO production stops, and Oxiperm Pro OCD-162-05, -10 - the continues after elimination of HCl or NaClO container is empty. chemical containers must be positioned the fault.
Page 42
Error message, Cause Remedy reaction of Oxiperm Pro 7. "Timeout pump HCl": During HCl supply, the level in the reaction tank has Check the hose from pump to reaction tank – ClO production is terminated. increased too slowly between levels K1 and K2. for assembly faults.
Page 43
Error message, Cause Remedy reaction of Oxiperm Pro 14. "fault of electrode/buffer": Repeat the calibration. Call Service to Auto reading of buffer data. Calibration fault at – ClO production proceeds. clean the measuring cell or to replace the calibration level. pH electrode.
Page 44
Error message, Cause Remedy reaction of Oxiperm Pro 23. "wire breakage current output 2": The measured chlorine dioxide value can no longer – ClO production proceeds. be transmitted. – Alarm relay activated. a) Cable breakage at the current output. Call Service to replace. –...
Page 45
Error message, Cause Remedy reaction of Oxiperm Pro 31. "fault current input": Cable breakage at current input 1 – ClO production proceeds. • A water flow meter is connected, and the signal – Alarm relay activated. exceeds the full-scale value of 20 mA. Call Service.
Connect temperature sensor. temperature compensation. fluctuate on display. c) Electrostatic charge of controller by rubbing the Do not rub hands on/against the cover. cover. 9.13 Calibration calibration GRUNDFOS DIN/NIST cal. meas. value cal. meas. value cal. meas. value others h/m3 µA/mg/l h/m3 cal.
Page 47
To calibrate the chlorine dioxide measured value, a reference μA measurement must be taken. This can be made with the Grundfos DIT photometer and the usual reagents. The determined reference value is entered by correcting the current measured value in the display.
Page 48
(difference of at least 1 pH) -57.88 mV/pH within the set pH measuring range. [N/A] -0.6 mV 8. GRUNDFOS > [OK]. 18. Remove the pH electrode from the buffer solution, and rinse buffer temp. with water. 25 °C 19.
10. "cal. result" > [OK]. The "ORP offset value is displayed as the 9.14 Manually starting or stopping ClO dosing result (for example 2 mV). This is the deviation between the 1. Press [Man]. entered mV value and the measured mV value of the buffer –...
10. Maintenance 11. Accessories list The Oxiperm Pro OCD-162 disinfection system must be serviced Prior to installation, the operator must purchase the once a year. The current and next maintenance date are following accessories according to the product numbers in the displayed in the operating software.
12. Photos Fig. 21 OCD-162-5, -10 Pos. Component Controller with display and control elements Reaction tank Batch tank Adsorption filter Dosing pump for 7.5 % sodium chlorite (NaClO Dosing pump for 9 % hydrochloric acid (HCl) Dosing pump for chlorine dioxide (ClO Solenoid valve for dilution water...
Page 52
Fig. 22 OCD-162-30, -60 Pos. Component Batch tank Reaction tank Controller with display and control elements Adsorption filter Dosing pump for 7.5 % sodium chlorite (NaClO Dosing pump for 9 % hydrochloric acid (HCl) Solenoid valve for dilution water Multi-function valve Dosing pump for chlorine dioxide (ClO Suction lance...
13. Disposal The Oxiperm Pro OCD-162 disinfection system and its associated parts must be disposed of in an environmentally friendly way. Note Note The system may only be dismantled by authorized personnel trained by Grundfos. The operating company is responsible for ensuring an environmentally friendly disposal.
Page 54
Normas aplicadas: EN 61326-1:2006, EN 61000-3-2:2006+A1:2009+A2:2009, EN 61000-3-3:2008. This EC declaration of conformity is only valid when published as part of the Grundfos installation Esta declaración CE de conformidad sólo es válida and operating instructions. cuando se publique como parte de las instrucciones de instalación y funcionamiento de...