Choose "Li-Ion RCT Power" or your appropriate
12
battery type.
Press "Flash" to finish the battery setup and
13
press "return" to get on start page.
Switch the battery on by setting the battery
14
ON/OFF switch to "1".
15
After the inverter has checked the specifications,
it starts calibrating the battery.
The battery is charged to 100%, which can take
several hours.
(When calibrating, power may be used out from
the grid to speed up the process if the power is
insufficient)
When calibration is complete, the system
automatically switches to compensation mode.
Note: For further information on installation and operation, please refer to the detailed user manual, which
can be obtained from our website
[8] How to switch off the system
Step Description
Locate DC switch (Fig. 1, b) and turn to "0" position and switch off the battery with the ON/OFF switch to "0".
1
2
Locate and switch off circuit breaker, main breaker or fuse for disconnecting inverter from utility grid.
3
Wait 10 minutes until capacitors have discharged.
4
Locate DC / PV connectors (Fig. 1, c) and DC / battery connectors (Fig. 1, h). Press latches of male plug
together to unlock and pull off DC plugs.
www.rct-power.com
.
14

Advertisement

loading
Need help?

Need help?

Do you have a question about the Power Storage DC 4.0 and is the answer not in the manual?

Questions and answers

Related Products for RCT Power Storage DC 4.0

This manual is also suitable for:

Power storage dc 5.0Power storage dc 6.0