Wiring Diagram - Intertek MES80 Installation Instructions Manual

Ultra low nox gas furnace
Table of Contents

Advertisement

Wiring diagram

6 FLASHES
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.
BR
YL
YL
OR
OR
BK
WH
WH
YL
BK
BK
GND
NEUTRAL
LINE MOTOR XFMR HUM EAC FLAME
WH
WH
BK
RD
BK
GN
RD
OR
GY
SW1
AUXILIARY LIMIT OPEN
GN
GND
AUTO RESET BURNER
TEMPERATURE CONTROL
C
G
Y
TO
MICRO
W
R
TH (10)
XFMR-H
FAN
OR
BL
T14
HEAT
RD
T7
COOL
BK
T5
COM
T8
PARK
T13
PARK
BR
T20
LINE-H
24
DOOR
SWITCH
VAC
120
VAC
40 VA
TRANSFORMER
34
HUMIDIFIER
INTEGRATED
CONTROL MODULE
TR (11)
GND
GND
C2
GAS
MVC (8)
VALVE
M1
MV(12)
PRESSURE
TRANSDUCER
PT (3)
PT (2)
PT (1)
HLI (7)
HLO (4)
AUTO RESET
AUXILIARY LIMIT
CONTROLS
RO2 (6)
RO1 (5)
24 VAC
40 VA
TRANSFORMER
120 VAC
FLAME SENSOR
FS
HOT SURFACE
IGNITER
HSI(1)
ID
BLWR
IDB(2)
CIRCULATOR
BLWR
ELECTRONIC
AIR
CLEANER
EAC-H
JUNCTION BOX
GND
DISCONNECT

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MES80 and is the answer not in the manual?

Table of Contents