Figure 42 - Horizontal And Vertical Venting - Nordyne M4RC Installation Instructions Manual

Single stage condensing gas furnace
Hide thumbs Also See for M4RC:
Table of Contents

Advertisement

HORIZONTAL
VENTING
(2-Pipe Shown)
3 _
2" x 3" Neoprene
._
Couplings
with 2
Hose Clamps
First Support
as Close
to Furnace as Possible
Straps or Other Suitable
_.
Supports
at minimum
.,--
Seal / Caulk
3"x90 ° Elbows
_
... 5ft. Intervals
.__
_
.._
Around Pipes
X
!i
_-,
i
,-
i
,-
i
_-, _,_///
atWall
..... i' ...................
ii
,i
:!
,i
i_,
i .............. .......
3"x90 ° Elbow
Upward Pitch 1/4" Per Foot
!Y_/"
,. I ',
.[
(Exhaust Vent)
_
_
V
lZ'Min.
.
..
_3
C_/mbt#tipn
A,r
W_II"
__'_'_
Normal
Snow Level
See Table 15 for
2" PVC Pipe Lengths
(Field Supplied)
Support
System on
Vertical
Rise
VERTICAL
VENTING
(2-Pipe Shown)
Support
System on
Vertical
Rise
First Support
as Close
_
to Furnace as Possible
22_]
3"x 90° E'bows
_
_::::
1J
3" Exhaust
Vent _
(Exhaust
Vent)
3" x 90 ° Elbow
3" Combustion
Air Vent Pipe
2" x 3" Neoprene
Couplings
with 2
Hose Clamps
See Table 15 for
2" PVC Pipe Lengths
(Field Supplied)
Figure 42. Horizontal
and Vertical Venting
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

M4rl

Table of Contents