Setup And Assembly; Unpacking And Clean Up; Shipping Contents; Assembly - Promac PBM-1839BDV Operating Instructions Manual

Milling drilling centre
Table of Contents

Advertisement

6.0  Setup and Assembly 
  WARNING: 
Read and understand the entire contents of this manual 
before attempting assembly or operation. Failure to comply 
may cause serious injury. 
6.1  Unpacking and clean up 
Remove all contents from shipping crate and compare parts to 
the contents list in this manual. If shipping damage or any part 
shortages  are  identified,  contact  your  distributor.  Do  not 
discard crate or packing material until drill press is assembled 
and running satisfactorily. 
Clean  all  rust  protected  surfaces  with  kerosene  or  a  light 
solvent. Do not use lacquer thinner, paint thinner or gasoline, 
as these can damage plastic components and painted surfaces. 
6.2  Shipping contents 
Machine 
Draw bar M12 
Chuck guard 
Operating tools 
Operating instructions and parts manual 
 
6.3  Assembly 
The machine comes completely assembled. 
Attach the crank handles to the hand wheels (B, F, I, Fig 5‐1). 
Inspect that all fasteners are tight. 
 
6.4  Initial lubrication 
The machine must be serviced at all lubrication points before it is 
placed into service (see chapter 11.1 for lubrication). 
 
6.5  Installation 
Unbolt the lathe from the shipping crate bottom. 
Use heavy duty fibre belt for lifting the machine off the pallet. 
 Warning:  
The machine is heavy (110 kg)! 
Assure the sufficient load capacity and proper condition of your 
lifting devices. 
Never step underneath suspended loads. 
To avoid tipping, the machine must be bolted down with four 
anchor bolts (not provided). 
To avoid twisting the bed, make sure the setup surface is 
absolutely flat and level. 
Loosen anchor bolts, shim and tighten bolts if needed. 
The machine must be level to be accurate! 
 
7.0  Electrical Connections 
  WARNING: 
All electrical connections must be done by a qualified 
electrician in compliance with all local codes and ordinances. 
Failure to comply may result in serious injury. 
The  PBM‐1839BDV  Milling  Drilling  Centre  is  rated  at  1~230V, 
50Hz power supply. The machine comes with a plug designed 
for use on a circuit with a grounded outlet. 
Mains connection and any extension cords and plugs used 
must comply with the information on the machine license 
plate.  
The mains connection must have a 16A surge‐proof fuse. 
Only use extension cords marked H07RN‐F, with wires 1,5mm
or more. 
The total length of cord may not exceed 18 Meter 
Power cords and plugs must be free from defects. 
Connections and repairs to the electrical equipment may only 
be carried out by qualified electricians. 
The machine is equipped with 1.8m power cord and plug. 
Before connecting to power source, be sure main switch is in 
off position.  
 
7.1  Grounding instructions 
This  tool  must  be  grounded.  In  the  event  of  a  malfunction  or 
breakdown,  grounding  provides  a  path  of  least  resistance  for 
electric current to reduce the risk of electric shock. This tool is 
equipped  with  an  electric  cord  having  an  equipment‐
grounding conductor and a grounding plug. The plug must be 
inserted  into  an  appropriate  outlet  that  is  properly  installed 
and  grounded  in  accordance  with  all  local  codes  and 
ordinances.  
  WARNING: 
Improper connection of the equipment‐grounding conductor 
can result in a risk of electric shock. Check with a qualified 
electrician or service person if you are in doubt as to whether 
the outlet is properly grounded. Do not modify the plug 
provided with the tool. 
The  green/yellow  conductor  is  the  equipment‐grounding 
conductor. If repair or replacement of the electric cord or plug 
is  necessary,  do  not  connect  the  equipment‐grounding 
conductor to a live terminal. 
Use only 3‐wire extension cords with grounding plugs. 
Repair or replace damaged or worn cord immediately. 
7.2  Extension cords 
The  use  of  extension  cords  is  discouraged;  try  to  position 
machines  near  the  power  source.  If  an  extension  cord  is 
necessary, make sure it is in good condition.  
10

Advertisement

Table of Contents
loading

Table of Contents