PREPARING
Assemble the following tools and materials:
•
Tweezers (optional)
•
EasyCare CalCheck
•
Pipettes
•
Container of water
INITIAL CHARGING
units
®
1. Remove the EasyCare
CalCheck
shipping tube.
2. Remove the red rubber cap,
and separate the two chambers
by pulling them apart.
Note: The chambers are press-
fitted together and have no
threads.
3
units from the
®