Information On The Data Plate; Ce Marking; Set-Up; Unpacking The Product - Vaillant ecoTEC plus VU GB 5-5 Series Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

4 Set-up

3.1.2
Functional element (1006/5‑5 and 1206/5‑5)
16
15
14
13
12
11
10
9
1
Connection for the
air/flue pipe
2
Fan
3
Gas pipe
4
Supply air connector
5
Flue pressure switch
6
Return temperature
sensor
7
Safety cut-out (flue gas)
8
Water pressure sensor
3.2

Information on the data plate

The data plate is mounted on the underside of the product at
the factory.
Information on the
Meaning
identification plate
Serial number
for identification; 7th to 16th digits =
product article number
VU...
Vaillant gas-fired wall-hung boiler for
heating
ecoTEC plus
Product designation
H, G20 – 20 mbar
Gas group and gas connection pressure
(2.0 kPa)
as set at the factory
Cat. (e.g. II
)
Unit category
2H3P
Types (e.g. C
)
Gas-fired boiler types
33
PMS (e.g. 6 bar
Permissible total overpressure
(0.6 MPa))
T
(e.g. 85 °C)
Max. flow temperature
max.
230 V 50 Hz
Electric connection
(e.g. 260) W
Max. electrical power consumption
8
1
2
3
4
5
6
7
8
9
Electronics box
10
Integral condensation
heat exchanger
11
Manometer
12
Flow temperature
sensor
13
Safety cut-out
14
Ignition electrode
15
Automatic air vent
16
Monitoring electrode
Information on the
Meaning
identification plate
IP (e.g. X4D)
Level of protection
Heating mode
P
Nominal heat output range
Q
Heat input range
Note
Make absolutely sure that the product is compat-
ible with the gas group at the installation site.
3.3

CE marking

The CE marking shows that the products comply with the
basic requirements of the applicable directives as stated on
the data plate.
The declaration of conformity can be viewed at the manufac-
turer's site.
4
Set-up
For fault-free operation and a long service life for the
product, you must only install the product in installations with
system separation (plate heat exchanger).
4.1

Unpacking the product

1.
Remove the product from its box.
2.
Remove the protective film from all parts of the product.
4.2

Checking the scope of delivery

Check that the scope of delivery is complete and intact.
4.2.1
Scope of delivery
Num-
Designation
ber
Unit mounting bracket
1
Heat generator
1
1
Condensate trap
1
Condensate discharge hose
Mounting template
1
Enclosed documentation
1
Enclosed unit fastening
1
Bag with small parts
1
Gas connector
1
1
Service valve (1 1/2 inches), red handle
Service valve (1 1/2 inches), blue handle
1
Bag with seals for service valves
1
Expansion relief valve, 6 bar
1
1
R 1 straight-through gas valve
Installation and maintenance instructions ecoTEC plus 0020134823_07

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents