Securing The Vanity; Adjusting The Doors - Icera St. Thomas Creations Canto Installation & Care Manual

Vanity
Table of Contents

Advertisement

2. SECURE THE VANITY
Posi on lag bolts at ends of back rail
and secure into bracing.
2x6 Bracing
Pilot Hole
Washer
Lag Bolt
Leveler
CAUTION: Risk of injury or property damage. Select 250 lb (113.4kg) load-bearing 5/16"
lag bolts with a length to clear obstacles in the wall and 5/16" washers. Calculate proper lag
bolt length by adding the following: 1-1/2" (38mm) backing material + wallboard thickness
+ back rail thickness.
CAUTION: Risk of product damage. Drill the lag bolt pilot holes in the ends of the back rail
to provide maximum support and prevent flexing of the unit.
□ With assistance, lift and place the vanity in position against the finished wall. Do not drag
vanity into position.
□ Verify the vanity is level and plumb against the wall. If necessary, turn the leveler(s) to
adjust the unit.
□ Using a 1/4" drill bit, drill two pilot holes through the ends of the back rail and the finished
wall. Verify the pilot holes are positioned in the back rail ends and ensure that the lag bolts
will engage the 2x6 backing material or any studs.
□ Secure the vanity to the wall with two 5/16" lag bolts and washers (not provided).
□ Install accessories (shelves, drawers, other) as desired. Refer to the section in this guide for
proper installation.
Back Rail
3
3. ADJUST THE DOORS
□ Screw cover may need to be removed for access (not shown). Push tab at back of assemble
to release the cover lock.
□ The hinges can be adjusted for proper door functionality and alignment.
□ Refer to the illustration and note the screwdriver location for desired adjustment.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

St. thomas creations metal trim cantoSt. thomas creations nouveauSt. thomas creations malibuSt. thomas creations renaissanceSt. thomas creations presleySt. thomas creations richmond

Table of Contents