Operator Interface Terminal (Oit) - Waterous Aquis 2.5 SSP Installation & Operation Instructions

Foam control
Table of Contents

Advertisement

Waterous, Arizona Operations
A. Operator Interface Terminal (OIT)
Cables: 3 meter (standard)
The OIT (Display) is designed to be
mounted in the operator panel of the
apparatus. The cutout needed for the
OIT, in the operator panel, is Figure 8 in
back of this manual.
Aquis 2.5 SSP Installation & Operation
The OIT is secured with four
compression latches.
Note: Extension cables can be
daisy chained to obtain longer
lengths.
The display requires 5 inches [127
mm] minimum from the back of the
operator panel to clear cables and
connectors.
Once the OIT (Display) is mounted,
connect the OIT (Display) cable
from the motor driver box (on the
Pump / Motor Driver Assembly)
terminal to the 8 pin connector on
the back of the OIT (Display).
Make sure there is enough
clearance behind the OIT assembly
for the cables.
Once the OIT assembly is mounted,
connect the control cable (8 pin)
from the control box to the back of
the OIT assembly.
Page 15 of 30
Rev 3
5‖