AV Link PMB100 Installation Manual

Advertisement

75×75
10kg
100×100
17"-30"
STEP1
Attaching thumbscrew to bracket
STEP2
Attaching bracket to screen
1
C
A/B
Increase no of washers based
on screen requirements
Item No.:PMB100
Installation guide
-85°~15°
E
2
Secure the top fixing screws to
the screen using the fixings
provided
M4x12MM
M5x12MM
¢6.5x¢13x2
A(4PCS)
B(4PCS)
2.5X2.5MM
E(1PC)
F(1PC)
G(1PC)
Mount Bracket (1PC)
3
Secure the bottom fixing screws to
the screen using the fixings provided
5X5MM
C(8PCS)
D(1PC)
C
A/B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PMB100 and is the answer not in the manual?

Questions and answers

Summary of Contents for AV Link PMB100

  • Page 1 Item No.:PMB100 M4x12MM M5x12MM ¢6.5x¢13x2 5X5MM Installation guide A(4PCS) B(4PCS) C(8PCS) D(1PC) 2.5X2.5MM E(1PC) F(1PC) G(1PC) Mount Bracket (1PC) 75×75 10kg 100×100 17"-30" -85°~15° STEP1 Attaching thumbscrew to bracket STEP2 Attaching bracket to screen Secure the top fixing screws to...
  • Page 2 STEP3 5x5mm Fixing screen and bracket to 35mm pole 2.5x2.5mm Fix the screen and bracket to a suitable 35mm pole mounting and ensure the thumbscrew is securely tightened. To adjust the screen angles use the Finally lock the bracket in place using locking collar (F) 5x5 allen key supplied CAUTION...

Table of Contents