Disassembly and Reassembly
Binding Wire Small Chassis (RD080/100/120HHXG✳) (cont.)
Binding Wire 5
◆ Place the High/
Low Pressure Sensors,
Temperature Sensor,
Main EEV, and EVI EEV
WIRE inside the hook.
◆ MAIN PBA
◆ Use a screw to fix the earth
wire.
3-29
◆ Place the Pressure S/W, CCH and
Valve Wires inside the box to fix and
use the two holders so they can be
tied together.
ASSY PBA CT LOW:
Only applied to 2 FAN and
3COMP model
HUB/BLDC/
COMM and WIRE must be
fixed on the same path as the
dotted lines.
MAIN PBA
and WIRE must be fixed on the
same path as the dotted lines.
◆ Use a holder assigned to BEAM to
fix the MAIN POWER/COMP WIRE, and
make sure they do not touch the
relay or the fuse.
HUB/BLDC/COMM
Samsung Electronics