End Of Operation - Zuwa Solarcheck Mobilcenter P80 Operating Instructions Manual

Hide thumbs Also See for Solarcheck Mobilcenter P80:
Table of Contents

Advertisement

ZUWA SOLARCHECK MOBILCENTER english

5. End of operation

After filling and flushing the solar system
> Switch off pump.
> Close fill and vent valve at the solar station.
> Open stop valve between fill and vent valve.
The pressure that is generated between pump outlet and fill valve when flushing the
pipe can be released by opening the filter at the pump inlet. It will be easier then to
unscrew the filling hose from the fill valve.
Caution: Collect escaping pumped media in a container.
> Unscrew the filter casing and flush remaining liquid.
> Unscrew the filling hose from the fill valve.
> Unscrew return hose from vent valve.
> Screw open hose ends together with the provided connecting piece in order to
avoid dripping or escaping of fluid during transport.
7.
Open tank lid to ensure the circulation
of the air.
Caution: Monitor fluid level in the tank and,
if necessary, refill heat transfer fluid to
prevent air entering the solar circuit.
8.
Flush the solar circuit with the fluid.
Check at the inspection window of the
filter or through the tank opening if there
are still air bubbles in the heat transfer
fluid. Continue flushing until there is no
air remaining in the fluid.

Advertisement

Table of Contents
loading

Table of Contents