Introduction Congratulations on your purchase of the Club Chair V2, Mystia, or 5th Avenue pedicure chair. This manual is designed to be given to the licensed plumbers, electricians, and any other technicians performing the installation of your pedicure chairs. Installer(s): Please review this manual in detail before beginning installation, and follow all safety warnings, labels, and instructions.
SECTION 1: SAFETY INFORMATION Safety Symbols Indicates an imminently hazardous situation which could result in serious Familiarize yourself with the following or fatal injury. Safety & Warning symbols. They are designed to prevent damage and injury to you, your clients, and your new Earthlite product.
SECTION 2 : PRODUCT OVERVIEW Electrical Specifications Spec North America Europe/Asia Input Voltage 120 VAC 220 VAC Input Frequency 60 Hz 50 Hz Total Consumption - All 9.5 Amps Max 5.2 Amps Max Options Consumption - Chair & 4 Amps Max 2.2 Amps Max Hydrotherapy Tub Only Consumption - Relaxor...
SECTION 2 : PRODUCT OVERVIEW Club Chair V2 Mystia 5th Avenue Product Image* Chair Overall 49”H x 32”W x 38.5”D 45.5”H x 30.25”W x 35”D 48”H x 32”W x 36.75”D Dimensions Tub Overall 15.5”H x 22”W x 26.5”D 15.5”H x 22”W x 26.5”D 15.5”H x 22”W x 26.5”D...
SECTION 2 : PRODUCT OVERVIEW Plumbed Tub Overview Tub Basin Footrest Adjustment Knob Power Button - Jets* Power Button - Lights* Remote Drain Power Button - Discharge Handle Pump (Optional) Water Control Valve (Fill & Temperature) Sprayer/Fill Drain Jets* Light* Reflexology* *Features are on hydrotherapy tub only...
SECTION 3: INSTALLATION Club Chair V2 THE FOLLOWING TECHNICAL DIAGRAMS SHOULD BE GIVEN TO YOUR ENGINEERS, ARCHITECTS, DESIGNERS, ELECTRICIANS & PLUMBERS. Failure to comply with federal, state, or local codes and ordinances could result in the voiding of product warranty as well as potential injury and flooding. A licensed plumber should make all utility connections.
Page 9
SECTION 3: INSTALLATION 5th Avenue THE FOLLOWING TECHNICAL DIAGRAMS SHOULD BE GIVEN TO YOUR ENGINEERS, ARCHITECTS, DESIGNERS, ELECTRICIANS, & PLUMBERS. Failure to comply with federal, state, or local codes and ordinances could result in the voiding of product warranty as well as potential injury and flooding. A licensed plumber should make all utility connections.
Page 10
SECTION 3: INSTALLATION Mystia THE FOLLOWING TECHNICAL DIAGRAMS SHOULD BE GIVEN TO YOUR ENGINEERS, ARCHITECTS, DESIGNERS, ELECTRICIANS & PLUMBERS. Failure to comply with federal, state, or local codes and ordinances could result in the voiding of product warranty as well as potential injury and flooding. A licensed plumber should make all utility connections.
SECTION 3: INSTALLATION Swingaway Manicure Trays (Optional) The Swingaway Manicure Trays may need to be taken into account when determining spacing between chairs. See below dimensions and positioning examples for reference. 11.5” 11.5” 23.5” 23.5” Tray Positioning The manicure trays can easily be swiveled to any position that is desired. Below are the most commonly used tray positions and their functions.
SECTION 3: INSTALLATION Tub Installation & Anchoring Guidelines Remove 4 screws on back access panel, and 2 screws from the drain handle plate. (Screws are indicated by the blue circles in Fig. 1 and Fig. 2 below.) Fig. 1 Fig. 2 Remove back access panel and set aside Gently place tub on its side and locate the nut securing the drain handle.
SECTION 3: INSTALLATION Electrical Service • 110V/60 Hz or 220V/50 Hz GFCI protected grounded circuit must be used to supply power to the pedicure tub. • Cutting off the end of the electrical plug to hardwire the spa is NOT recommended, and can void the warranty.
Page 15
SECTION 3: INSTALLATION Option 2 - Plumbed to the Floor • Use this opti on if your hot and cold water supply and drain line will be located in the fl oor underneath the tub. For this opti on, a licensed plumber will need to disconnect the internal connecti ons from the manifold and re-route the lines as needed.
SECTION 3: INSTALLATION Drain Specification Female 1.5” thread Male 1.25” thread (Unit will ship with this (Unit will ship with this opening pre-connected to an opening pre-connected to elbow fitting that attaches to the twist handle that opens/ the discharge pump.) closes the drain) Male 2”...
SECTION 3: INSTALLATION Backflow Prevention Each pedicure tub comes with a dual backflow preventative device pre-installed. This device utilizes two (2) 15mm check valves that are certified to ANSI/NSF 61 and ASME A112.18.3 (see detailed specification from manufacturer on the next page)The ASME A112.18.3 standard, in Section 8.1.1, indicates that “there shall be at least two backflow prevention devices, in series”.
SECTION 3: INSTALLATION Frequently Asked Questions Does the tub have backflow prevention? Yes - see pages 10-11 for backflow prevention details. Do I still have to install backflow prevention on my main water supply line? This is entirely dependent on your local and/or state codes. A licensed plumber with knowledge of your local and/or state codes can answer this question for you.