Page 1
PVB S AYPRO ERIES ECOND LOOR NTERNATIONAL YSTEM Installation and Operating Instructions Applicable Part Numbers/Models: PVB-2500: Second Floor International Net System JSL-Inst046 www.jayprosports.com...
PVB Series Second Floor International Net System Instructions Table of Contents Safety ........................ 1 Specifications ....................1 Introduction ..................... 2 Required Tools ....................4 Included Hardware & Components ............4 5.1 System Components................4 5.2 Hardware ....................6 Assembly ......................7 Maintenance ....................
If you require additional information or support to install or operate your volleyball system, please contact the Jaypro Sports customer support team, Monday through Friday, 8:30AM to 5:00 PM (EST), at 1-800-243-0533. NCAA and NFHS rules require that the upright standards must be installed at least 3’3”...
Page 4
PVB Series Second Floor International Net System Instructions Figure 3-1: Correct floor anchor layout. Refer to instructions included with floor anchors for anchor installation details. - 3 of 11- JSL-Inst046 www.jayprosports.com...
Before continuing, please open all packages to verify that you have all the required hardware for installation and setup. If any of the following items are missing, contact the Jaypro Sports customer support team, Monday through Friday, 8:30AM to 5:00 PM (EST), at 1-800-243-0533.
Page 6
PVB Series Second Floor International Net System Instructions Figure 5-3: Winch with strap (PVBWINCH, 1X). Figure 5-4: Flex-Net (PVBN-6, 1X) Figure 5-5: Antennae and Net Tapes (VBA-4, 1 pair) - 5 of 11- JSL-Inst046 www.jayprosports.com...
PVB Series Second Floor International Net System Instructions Assembly WARNING: Uprights are heavy. Do not attempt to lift or install without assistance. 1. Install each upright into the t-bases and tighten each square headed set screw. 2. Follow instructions included with winch to set the winch clamp to the correct upright diameter (3-1/2”).
Page 9
PVB Series Second Floor International Net System Instructions 5. Install the anchor strap to the upright without the winch (Figure 6-2). Figure 6-2: Install anchor strap. 6. Roll the standards into position with the hand knob assemblies directly over the floor anchors.
Page 10
PVB Series Second Floor International Net System Instructions 8. Set the height of the uprights using the installed height adjust pin (Figure 6-4). WARNING: Do not attempt to remove the height adjuster pin if the net is under tension. Figure 6-4: Set upright height.
Page 11
PVB Series Second Floor International Net System Instructions 12. Verify net heights and net centering. The uprights will deflect inward and downward due to net tension; you may need to adjust their heights and/or re- center the net. 13. Attach the bottom net straps to each upright as shown in Figure 6-6. Wrap Velcro straps around buckles for additional player safety.
PVB Series Second Floor International Net System Instructions Maintenance Your PVB Series Second Floor International Net System is designed to provide years of play; however, it is recommended that the components be inspected at least once every season, for signs of excessive wear. Key areas to inspect include (but are not...
Need help?
Do you have a question about the PVB SERIES and is the answer not in the manual?
Questions and answers