QVE1901U Flow Switch

Engineering Notes

Flow Switch
Installation
Mechanical installation
General installation
instructions
Siemens Industry, Inc.
• On site:
A T-junction with a female-threaded (1/2" NPT) fitting is required for 3/4" to 2"
line sizes.
A 1-inch, female-threaded (1/2" NPT) welding socket is required for 3" to 8" line
sizes.
• All dimensions and data provided in the table of switching values are based on water
at 68°F (20°C), and the use of T-junctions and horizontal piping.
• When choosing the installation site, ensure that the specified limit values (see
Technical Data) are not exceeded.
• Select suitable measures to prevent the medium from freezing. If the flow switch is to
be used in ambient temperatures of <39°F (4°C), do not carry out any operation
beforehand using pure water. Residual water in the flow switch can result in frost
damage.
• First, clean the pipe system where the flow switch is installed and remove any
magnetic particles, such as welding residue.
• The laminar path length in front of and behind the flow switch must be at least 10
times and 5 times the pipe diameter, respectively.
• The nominal installation position of the flow switch is an upright standing position in
horizontal pipework.
• The switches should only be installed in a vertical position with a maximum deviation
of 45°.
Figure 2. Acceptable Switch Mounting Positions.
• Ensure that there are no external magnetic fields in the immediate vicinity of the flow
switch, since these can impair device operation.
• There is an arrow on the flow switch. Install with the arrow parallel with the pipe
shaft, facing in the flow direction.
• The brass connecting nut G¾ has a tightening torque of 18 to 22 lb-ft (25-30 Nm)
Figure 3. Flow Direction Arrow.