GE ENERGY STAR AEC18 Series Owner's Manual & Installation Instructions page 11

Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
3. PREPARE THE AIR CONDITIONER
(continues)
E. Remove the ground screw from the left side of
the case. Keep it in a safe location. NOTE: Be
sure to save this screw. You will need them
later in the installation.
F. Slide the air conditioner from the case by
gripping the base pan handle and pulling
forward while bracing the case. Do not pull or lift
on the foam discharge area.
4. PREPARE THE CASE
A.
Attach the top rail gasket to the bottom of the
top rail.
B
.
Install the top mounting rail with 4 type A screws
from the inside of the case. Press firmly to drive
the gasket and through the top
the screws into
mounting rail.
Top mounting rail
49-5000090
4. PREPARE THE CASE
C.
Slide each side retainer onto the edge of each
according panel. The figure shows the orientation
of each accordion panel and side retainer
assembly relative to the case from a top view of
the unit.
Do not
pull or
lift in this
area—
damage
to the
unit may
D.
result
Slide the left and right accordion panels into the
top and bottom mounting rails.
FRONT
E.
Attach the side retainers to the case using 6 type A
screws.
SIDE RETAINER
WINDOW FILLER PANEL
SIDE RETAINER
WINDOW FILLER PANEL
Top mounting rail
Top left
Bottom mounting rail
Top right
11

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents