Download Print this page
ABB Arc Guard System TVOC-2 Installation And Maintenance Manual
ABB Arc Guard System TVOC-2 Installation And Maintenance Manual

ABB Arc Guard System TVOC-2 Installation And Maintenance Manual

Current sensing unit
Hide thumbs Also See for Arc Guard System TVOC-2:

Advertisement

Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time)
1 S FC 170 01 5 M 0 2 01 E N , R E V B
*
Current Sensing Unit
Installation and maintenance guide
* Appendix for Arc Guard System™ – TVOC-2 Installation and maintenance guide EN

Advertisement

loading

Summary of Contents for ABB Arc Guard System TVOC-2

  • Page 1 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) — 1 S FC 170 01 5 M 0 2 01 E N , R E V B Current Sensing Unit Installation and maintenance guide * Appendix for Arc Guard System™ – TVOC-2 Installation and maintenance guide EN...
  • Page 2 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time)
  • Page 3: Warning And Information

    Note that WARNING unauthorized repair affects safety and warranty. Warning icon indicates the presence of a hazard ABB personell have to, as a minimum, follow the which could result in damage to equipment or ABB CISE 15.4 instructions. property.
  • Page 4 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time)
  • Page 5 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) CURRENT SENSING UNIT INSTALL ATION AND MAINTENANCE GUIDE — Current Sensing Unit Installation and maintenance guide 1.1 Introduction 1.2 Mounting of the component 1.3 Electrical installation of CSU 1.4 Connection of optical fibre cables and detectors 1.5 Settings for operation...
  • Page 6 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) CURRENT SENSING UNIT INSTALL ATION AND MAINTENANCE GUIDE Introduction This is a appendix to Arc Guard System™, TVOC-2 Installation and maintenance guide, which shows operation connections between the TVOC-2 and the Current Sensing Unit (CSU).
  • Page 7 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) CURRENT SENSING UNIT INSTALL ATION AND MAINTENANCE GUIDE Electrical Installation of CSU This chapter describes the electrical installation of the CSU. For Wiring diagrams and layouts, see chapter 1.7 Diagrams and layouts.
  • Page 8: Settings For Operation

    Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) CURRENT SENSING UNIT INSTALL ATION AND MAINTENANCE GUIDE Connection of Optical Fibre Cables and Detectors General Before the detectors can be connected to the component the protective covers on the input terminals must be removed.
  • Page 9 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) CURRENT SENSING UNIT INSTALL ATION AND MAINTENANCE GUIDE Control Preform this test after installation, before using the unit. Switch on the supply voltage. Switch S1 to position 1, (the test position). A red lit LED, V22, indicates that S1 is in test position.
  • Page 10 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) CURRENT SENSING UNIT INSTALL ATION AND MAINTENANCE GUIDE Diagrams and layouts 1.7.1 Current Sensing Unit To a Current Sensing Unit, Arc Monitor, or Breaker Fault Unit Table 5 Current Sensing Unit From another Current Sensing Unit...
  • Page 11: Simplified Block Diagram

    12 10 11 13 14 Draft, ne pas diffuser Tue Dec 18 2018 15:16:42 GMT+0100 (Romance Standard Time) -24V CURRENT SENSING UNIT INSTALL ATION AND MAINTENANCE GUIDE -60V ≅110 - 125V *) 48 V DC w between 11 -220V, ∼230V 1.7.2 Simplified block diagram Table 5...
  • Page 12 We reserve the right to make technical changes or modify the contents of this document without prior notice. ABB does not accept any responsibility whatsoever for po- tential errors or possible lack of information in this docu- ment. We reserve all rights in this document and in the subject matter and illustrations contained therein.