Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
×
Bookmark added
×
Added to my manuals
Manuals
Brands
XCMG Manuals
Construction Equipment
XZ320
Operation instructions manual
Table Of Contents - XCMG XZ320 Operation Instructions Manual
Horizontal directional drill
Hide thumbs
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
Table Of Contents
66
page
of
66
Go
/
66
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
Table of Contents
Table Of Contents
3
Introduction
4
Designation
4
Applicable Scope
4
Product Characteristics
4
Rubber Crawler
5
Hydraulic Anchor Devices
5
Auxiliary Loading/Unloading Device Of Auger Stem
5
Hydraulic Power Assisting Device
5
Structure, Properties And Main Parameters
6
Outline Drawing Of Drill
6
Operating Principle And Structure
7
Main Structure
8
Chassis
8
Engine System
8
Power Head
8
Drilling Rig
9
Strong Auger Stem Holder
9
Vehicle-Mounted Mud System
9
Electric System
9
Water Temperature Gauge
10
Oil Pressure Gauge
10
Fuel Oil Gauge
10
Mud Pump Control
10
Principle Diagram Of Hydraulic System
12
Schematic Diagram Of Electric System
14
Safety Requirements
19
User's Facilities
20
Fire Extinguisher
20
Lighting Lamp
20
Classification Of Underground Dangerous Articles
20
Operation When Fuel Gas Pipes Are Broken By Drilling
21
Operation When Optic Fiber Cables Are Broken By Drilling
21
Operation When Tap Water Pipes Are Broken By Drilling
21
Division And Precaution Measures Of Construction Site
21
Detail Precaution Measures Of Various Kinds Of Construction Sites
22
Detail Precaution Measures Of Power Site
22
Other Site Protection Measures
22
Safety Warning Classification
22
Usage And Operation
24
Functional Instructions Of Switch, Handle Or Instrument
24
Operation Panel Of Left Console
25
Left Console Switch
25
Operation Panel Of Right Console
26
Right Console Switch
27
Operation Panel Of Auxiliary Console
27
Function Of Auxiliary Console
28
Operation Panel Of Post Console
28
Preparation
29
Data Collection
29
Site Exploration
30
Overall Flatness And Slope Of Construction Site
30
Verification Of Dangerous Articles
30
Slope
30
Space
31
Amenity
31
Design Bore Track
31
Definition Of Perforation Angle
31
Definition Of The Minimum Angle Buildup Distance
32
The Minimum Hole Location Depth
32
Equipment Preparation
32
Site Preparation
33
Bore Track Mark
33
Bore Preparation Point
33
Bore Path Record
34
Machine Startup
34
Drill Positioning
34
Assembly Of Drilling Rig
34
Transmitter Installation
35
(Optional) Special Pliers
36
Marking-On Processes
36
Connection Of Auger Stem
37
Connection Of Mud System
37
Guide Drilling
37
Operation Of Feeding & Revolution Handle
38
System Startup
38
Add Auger Stems
39
Holding The Auger Stem
39
Correction Direction
41
Positioning Of Drill Bit
41
Steering Steps
41
Design Notice Of Guide Hole
42
Soil Exit Of Drill Bit
43
Re-Expanding And Back Towing
43
Re-Expanding Steps
43
Define Mud Flow Requirements
43
Re-Expanding Prompt
44
Definition Of Mud Requirements
44
Pressure Estimation
44
Disassembly Of Auger Stem
44
Clamping Diagram Of Auger Stem
45
Shutdown
46
Technical Difficulties During Construction
46
Jamming Of A Drilling Tool
46
Hole Shrinkage
46
Hole Collapsing
47
Bore Expansion
47
Mud Loss
47
Mud Effusion
47
Mud Effusion Prevention Measures
48
Continue To Pump Mud Even If Drill Stops Operation
48
Expanding Efficiency
48
Quick Sand
48
Pipe Jamming
49
Add Antifreeze Fluid Into The Drill
49
Steps To Add Antifreeze Fluid:
49
Lubrication, Repair And Maintenance
50
Operation And Maintenance Of Rubber Crawler
50
Tension Force Of Rubber Crawler
50
Ground
50
Equipment Lubrication And Maintenance
52
Engine Maintenance
52
Sliding Rack Lubrication
52
Maintenance Of Power Head
53
Maintenance Of Hydraulic System
53
Maintenance Of Mud Pump
53
Ordinary Inspection
54
Ordinary Maintenance
54
Storage Battery
55
Pipeline Inspection
55
Engine Belt
55
Radiator
55
Short Connector
56
Install New Short Connectors With Tightening By Jaw Vice
56
Power Head Pulley
56
Filter Maintenance
56
Muffler
57
Inspection Of Power Head
57
Crawler Tensity
57
Maintenance Of Auger Stem
57
Transportation Notice
58
Support Dimension Diagram
58
Drill Transportation
58
Transportation, Storage And Protection
58
Daily Storage And Protection
60
Short-Term Storage
60
Mud Consumption
61
Appendix A : M U D C O N S U M P T I O
61
Nozzle Flow
63
The Maximum And Length Of Tow Pipes
63
Relation Diagram Of Pressure And Flow
63
Appendix B : N O Z Z L E F L O
63
Previous
Page
1
...
63
64
65
66
Show Quick Links
Quick Links:
Table of Contents
Operating Principle and Structure
Engine System
Lubrication, Repair and Maintenance
Hide quick links:
Permanently
Temporary
Cancel
Advertisement
Table of Contents
Related Manuals for XCMG XZ320
Construction Equipment XCMG XCT80 Operation Manual
Truck crane (250 pages)
Construction Equipment XCMG SQ10SK3Q Operation And Maintenance Manual
Loader crane (36 pages)
Construction Equipment XCMG QAY220 Operation Manual
(172 pages)
Related Content for XCMG XZ320
XCT80 Rotary Table Lock Device
XCMG XCT80
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL