Preparation; Data Collection - XCMG XZ320 Operation Instructions Manual

Horizontal directional drill
Table of Contents

Advertisement

Manual of XZ320 Horizontal Directional Drill
No.
1
Liquid control handle
of left leg
2
Liquid control handle
of right leg
3
Inclined liquid control
handle of drilling frame
4
Crash stop switch
5
Right
control handle
6
Left
control handle
7
Driving
switch
Note:Driving acceleration position must be in non-acceleration position
after finishing movable machines or power head can not be pushed or
pulled.

Preparation

2

2.1 Data collection

Successful construction begins from bore and existing documents of
the project and construction site shall be read firstly.
2.1.1 Contact utility pipeline company to position and mark existing
underground utility pipes.
2.1.2 Ask for pipe sample and detect weight and rigidity. Contact material
manufacturing department to consult to bending radius. Check if we have
suitable back tow facilities or not.
2.1.3 Contact local management department and discuss with relevant
safety measures if construction site is close to highway or other traffic
Table 5 Operation panel of post console
Name
driving
liquid
driving
liquid
acceleration
Function
To control expansion/retraction of
left leg
To control expansion/retraction of
right leg
To control expansion/retraction of
inclined oil cylinder of drilling frame
Crash stop switch of engine
To
control
motion of right crawler
To
control
motion of left crawler
To control driving speed
26
forward/backward
forward/backward

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents