Figure 18: Critical Hanger Placement - Seeley AIRA ATH Series Installation, Operation & Service Manual

Vacuum assisted linear, double linear, u-tube, and multi-burner gas fired heating systems
Table of Contents

Advertisement

A
ATH I
O
IRA
NSTALLATION
PERATION AND

Figure 18: Critical Hanger Placement

Side View
Description
Part Number
Burner Tube
Bow Shackle
Tube/Reflector Hanger
For suspension angles other than shown, additional chain supports may be required.
12 of 73
S
M
ERVICE
ANUAL
Typical Suspension Details
I-Beam
10 mm
600 mm
minimum*
Turnbuckle
(not included)
* Allows for thermal expansion of system.
Bow Shackle
Hanger
100 mm
Max.
03051100
E0007576
03090100
Concrete
Beam
Beam
Clamp
Anchor
I-Beam
Rod
300 mm
minimum*
Bow
Shackle
Front View
Screw Hook
min. 10 mm
Washer
Locknut
Washer
Wood
Beam
Hanger
45° Angle

Advertisement

Table of Contents
loading

Table of Contents