Download Print this page

Gared Sports OmniSteel 5100 Installation, Operation And Maintenance Instructions

Volleyball system

Advertisement

Quick Links

Installation, Operation and Maintenance Instructions
Please read all instructions before attempting installation or operation of these units
SAVE THESE INSTRUCTIONS FOR FUTURE USE
P
N
.
UBLICATION
O
6 0 1 7 5 5 4 1 7
Model: 5100
OmniSteel™ Volleyball System

Advertisement

loading
Need help?

Need help?

Do you have a question about the OmniSteel 5100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Gared Sports OmniSteel 5100

  • Page 1 Model: 5100 OmniSteel™ Volleyball System Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE UBLICATION 6 0 1 7 5 5 4 1 7...
  • Page 2: Table Of Contents

    5100 OmniSteel™ Volleyball System Table of Contents Section Page No. Introduction Parts Checklist Floor Sleeve Installation Floor Cover Installation Net Installation Instructions Maintenance and Check Sheet...
  • Page 3: Introduction

    If items are found to be nonconforming, replacements can be ordered from PSS or Gared Sports or one of our authorized dealers. When contacting PSS or Gared Sports, please have information...
  • Page 4: Parts Checklist

    5100 OmniSteel™ Volleyball System Set-up Guide Parts Checklist Verify all parts listed on packing list are present prior to installation. Floor Sleeves/Covers Plates (These may ship early and separately) -Floor Sleeves -Cover Plates Upright Posts (Refer to drawings or pictures in the instructions) -End Post(s) -Winch Post(s) Net/Cable Hardware...
  • Page 5: Floor Sleeve Installation

    5100 OmniSteel™ Volleyball System Floor Sleeve Installation 1. Mark (2) spots on the floor exactly 36 feet apart (refer to most recent set of architectural prints for exact locations within the gym). These represent the CENTERS of each sleeve installation. If sleeves are to be more or less than 36 feet apart, contact a PSS or Gared representative for information regarding this alteration.
  • Page 6 5100 OmniSteel™ Volleyball System Installation Instructions for Ground Sleeves...
  • Page 7: Floor Cover Installation

    5100 OmniSteel™ Volleyball System Counterbore Details and Floor Cover Installation...
  • Page 8: Net Installation Instructions

    5100 OmniSteel™ Volleyball System Net Installation Instructions 1. Lift and rotate brass floor covers out of the way. Insert the winch post and end post. 2. Remove adjustment pin to change height of upper telescopic tubes. Reinsert at the desired playing height.
  • Page 9 5100 OmniSteel™ Volleyball System Details – Winch Post with Net...
  • Page 10 5100 OmniSteel™ Volleyball System...
  • Page 11: Maintenance And Check Sheet

    5100 OmniSteel™ Volleyball System Maintenance 1. General inspection of equipment when used should be performed to ensure no catastrophic failures have occurred during the course of use between yearly inspections. 2. It is recommended that yearly inspections be conducted to determine if any bolts or any other hardware has become worn or loosened.
  • Page 12 Gared Holdings, LLC Performance Sports Systems Gared Sports 9200 E. 146 Street 707 North 2 Street Noblesville, IN 46060 St. Louis, MO 63102 800-848-8034 800-325-2682 www.perfsports.com www.garedsports.com...