Download Print this page
Festo NEBM-T1G8 Series Instructions & Assembly
Festo NEBM-T1G8 Series Instructions & Assembly

Festo NEBM-T1G8 Series Instructions & Assembly

Encoder cable

Advertisement

Quick Links

NEBM­T1G8­E­...­R3G8
Encoder cable
Instructions | Assembly
8088073
2018-05
[8088075]
Translation of the original instructions
1
Further applicable documents
All available documents for the product è www.festo.com/pk.
Observe further applicable documents:
Instruction manual for motor cable NEBM-T1G8...
2
Safety
2.1
Safety instructions
Do not connect or disconnect plug connector when powered.
Only assemble the product on components that are in a condition to be safely
operated.
2.2
Intended use
Connection of motor EMMS-AS to controller CMMT-AS.
3
Configuration
3.1
Product design
Fig. 1
3.2
Contact assignment
Field device side
Sock­
Pin
et
RD
1
2
3
4
5
6
YE
1
2
3
4
5
6
1) Colour code in accordance with IEC 60757:1983-01
Tab. 1 Contact assignment
Festo AG & Co. KG
Ruiter Straße 82
73734 Esslingen
Germany
+49 711 347-0
www.festo.com
8088073
1 Socket RD, 6-pin
2 Socket YE, 6-pin
3 Plug connector RJ45
4 Cable
Wire
Signal
Pin
Controller side
1)
GY
Data+
4
PK
Data–
5
GNWH
OV
8
BNGN
Up
7
YE
Clock–
2
VT
Clock+
1
WH
OV
6
BU
UD
3
4
Mounting
4.1
Mounting, field device side
Remove cover
Fig. 2
1. Unscrew screws (C) (ß 2).
2. Remove cover (A) from connection box (B).
Ä O-rings (D) are still on the screws (C).
The O-rings (D) prevent the screws from getting lost (C) and from damaging the
main seal.
Remove the strain relief
Fig. 3
1. Unscrew screw (F) (ß 2).
2. Remove the strain relief (E).
Place the encode cable in position
Fig. 4
1. Align the encoder cable (G) so that the flat side (I) points upwards.
2. Press the sockets 1 and 2 on the correct plug connector (J).
Place the motor cable in position
Fig. 5
Place the motor cable (H) in the connection box è Instruction manual for
motor cable (H).

Advertisement

loading

Summary of Contents for Festo NEBM-T1G8 Series

  • Page 1 Ä O-rings (D) are still on the screws (C). Further applicable documents The O-rings (D) prevent the screws from getting lost (C) and from damaging the main seal. All available documents for the product è www.festo.com/pk. Remove the strain relief Observe further applicable documents: –...
  • Page 2 Mount the strain relief Fig. 10 9. Do not bend cables all the way to the fastening point. Ä Mounting space A between the fastening point and bending movement is observed. Fig. 6 NOTICE! 1. Check that the brass rings (K) of the cables (G) and (H) are seated correctly at Damage to cables if the chain breaks.

This manual is also suitable for:

Nebm-t18g-e-r3g8 series