After installation has been completed, it is recommended that the entire system be checked against the following list:
1. Refrigerant Line, Leak checked ............................................ [ ]
2. Suction Lines and Fittings properly insulated ..................... [ ]
3. Have all Refrigerant Lines been secured and
isolated properly? ................................................................... [ ]
4. Have passages through masonry been sealed?
If mortar is used, prevent mortar from coming
into direct contact with copper tubing .................................. [ ]
5. Verify tightness of all electrical connects ............................. [ ]
6. Observe outdoor fan during on cycle for clearance
and smooth operation ............................................................ [ ]
7. Indoor coil drain line drains freely. Pour water
into drain pan ......................................................................... [ ]
11-BC11D1-9
MOUnTInG HOLe LOCATIOn
nOTe: ALL DIMenSIOnS Are In MM (InCHeS).

CHeCkOUT PrOCeDUre

Installer's Guide
8. Supply registers and return grilles open and
unobstructed........................................................................... [ ]
9. Return air filter installed ...................................................... [ ]
10. AccuLink™ control is accurate. Check
against a reliable thermometer. Adjust per
instructions with AccuLink™ control ................................... [ ]
11. Is correct airflow setting used?
(Indoor blower motor) ............................................................ [ ]
12. Operate complete system in each mode to
insure safe operation. ............................................................ [ ]
From Dwg. D152637 Rev. 2