Installing The Pe Cable - Huawei SUN2000-175KTL-H0 Quick Manual

Hide thumbs Also See for SUN2000-175KTL-H0:
Table of Contents

Advertisement

No.
Item
4
RS485
communication
s cable
5
(Optional)
Power cable of
the tracking
system
Note a: The value is valid only if the conductors of the PE cable and AC power cable use the same
material. If the materials are different, ensure that the conductor cross-sectional area of the PE
cable produces a conductance equivalent to that of the area S/2.
Note b: You are advised to use a soft cable to prevent poor terminal contact due to the bending
stress of the cable.
4.2

Installing the PE Cable

It is recommended that the PE cable
be connected to a nearby PE point.
Connect the PE points of all
SUN2000s in the same PV array to
ensure equipotential connections to PE
cables.
To enhance the corrosion resistance of
a ground terminal, you are advised to
apply silica gel or paint on it after
connecting the PE cable.
Type
Outdoor shielded
twisted pair cable
Three-core outdoor
copper cable with
dual-layer
protection
Specifications
Conductor cross-
sectional area: 0.25–1
2
mm
Cable outer diameter:
4–11 mm
Conductor cross-
sectional area: 10
2
mm
Cable outer diameter:
15–18 mm
6
Description
When three
communications cables
connect to the signal
cable connector, the
outer diameter of the
cables should be 4–8
mm.
-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-185ktl-inh0Sun2000-185ktl-h1

Table of Contents