Closing The Maintenance Compartment Door; Installing Dc Input Power Cables - Huawei SUN2000-175KTL-H0 Quick Manual

Hide thumbs Also See for SUN2000-175KTL-H0:
Table of Contents

Advertisement

Closing the Maintenance Compartment Door

4.8
4.9

Installing DC Input Power Cables

Selecting DC Input Terminals
The SUN2000 has three DC switches (DC SWITCH 1, DC SWITCH 2, and DC SWITCH3).
DC SWITCH 1 controls routes 1–6 of DC input terminals, DC SWITCH 2 routes 7–12, and DC
SWITCH 3 routes 13–18.
Select DC input terminals according to the following rules:
1. Evenly distribute DC input power cables on the DC input terminals controlled by the three DC
switches.
2. Maximize the number of connected MPPT circuits.
Ensure that the PV module output is well insulated to ground.
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-185ktl-inh0Sun2000-185ktl-h1

Table of Contents