Assembling The Top Rail Frame; Assembling The Leg Tubes To The Top Rail Tubes - Outbound 084-6693-4 Assembly, Installation And Use Manual

13x10 (4x3m) trampoline and enclosure
Table of Contents

Advertisement

ASSEMBLY
Step 3: Assembling the top rail frame
• Connect Top Rail Tubes (9A & 9B) to the T-Joints (4 & 5). Make sure
on T-Joints (5), the side with Spring Mechanism faces away from the
centre of the trampoline. Always slide the bigger end of the Top Rail
Tube (9A & 9B) into the T-shaped Joints (4 or 5) first. Repeat this step
with the other 11 rail tubes, making a total of 12 top rail sections.
• Connect all 12 assembled sections into one circle.
Note: When connecting the Top Rail Tubes (9A & 9B) to the
T-Joints (4 or 5) be sure that the hole on each T-Joint is facing the
inner side of the Top Rail Frame.
STEP 4: Assembling the leg tubes to the top rail tubes
• Connect the assembled Leg Tubes to the assembled Top Rail Frame.
• Slide the T-joints (4 & 5) into the Vertical Legs (6), make sure that the
locking tabs on the Vertical Leg Tubes (6) go through the hole on the
T-Joints (4 & 5).
Note: Make sure all the locking holes and tabs are facing inner
toward the jumping mat.
10
084-6693.indd 10
5
4
6
Locking
tab
Model No. 084-6693-4
7
TM
12/5/2014 1:06:38 PM

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Outbound 084-6693-4

Table of Contents