Making And Breaking Connections; Making A Connection; Illustration 2.H.1: Master Lifting Link - Farr HD8625 Technical Manual

Hydraulic power tong
Table of Contents

Advertisement

hD8625 8-
" 35K T
5
/
ong
8
H.

MAKING AND BREAKING CONNECTIONS

THESE OPERATING PROCEDURES ASSUME THE USER HAS PROPERLY SET UP AND PREPARED
THE EQUIPMENT FOR OPERATION AS PER SECTIONS 2D, 2E, AND 2F OF THIS MANUAL.
Set up and prepare your equipment for operation as per Section 2 of this manual Refer to the following sections:
• 2.D - Hydraulic Connections
• 2.E - Tong Jaw Installation
• 2.F.1 - Tong Rig-up and Leveling (Suspension)
• 2.F.2 - Tong Rig-up and Leveling (Leveling)
Your tong and backup assembly should be properly suspended, connected to a hydraulic power source, and ready to make or break con-
nections at this point.
1.

Making A Connection

a)
Ensure hydraulic power supply to the tong is energized. The master link on the rigid sling must be used to suspend the tong.
Do not suspend the tong directly from the rigid sling.
b)
Ensure the backing pin is in the "make-up" position. From the front of the tong, the backing pin correctly configured for makeup
will be in the 10 o'clock position (see Illustration 2.H.2 next page). If it is not, simply lift up and place in the correct position (see
Illustration 2 next page). The cage plate opening must be aligned with the door opening when setting the backing pin position.
T
M
2.18
echnical
anual
I
2.H.1: m
llustratIon
THE MASTER LINK MUST BE USED TO SUSPEND THE TONG ASSEMBLY
l
l
aster
IftIng
Ink
s
& o
eTup
peraTion

Advertisement

Table of Contents
loading

Table of Contents