This installation manual covers installation of CenterLine 230BP with Müller SPRAYDOS controllers. We have endeavoured to deliver a fault free product. To ensure optimal use of the equipment, we ask you to pay great attention when reading this manual. Regarding responsibility...
INTRODUCTION TO CENTERLINE 230BP The Centerline 230BP is a combined Guidance and Automatic Boom Section Control (ABSC) device that features control of up to 15 boom sections. CenterLine 230BP connects in parallel to the existing wiring loom to the section valves.
In case the SPRAYDOS controller is dam- aged during the installation, it's on the buyers sole risk and therefore the buyer is not entitled to any form for compensation. SPRAYDOS adapter cable CenterLine 230BP; Müller SPRAYDOS Installation Manual 020-041-UK R5...
Page 6
Lift the keypad and pull the controller flex cable carefully out of the connector. CenterLine 230BP; Müller SPRAYDOS Installation Manual CenterLine 230BP; Müller SPRAYDOS Installation Manual 020-041-UK R5 020-041-UK R5...
Page 7
Place the free wires of the SPRAYDOS adapt- er cable one by one in the hole and pull the cable trough as shown. Fasten the adapter with a cable strip (POS 1). CenterLine 230BP; Müller SPRAYDOS Installation Manual 020-041-UK R5...
Page 8
Connect the small adapter circuit board to the keypad flat cable connector as shown on the picture. CenterLine 230BP; Müller SPRAYDOS Installation Manual CenterLine 230BP; Müller SPRAYDOS Installation Manual 020-041-UK R5 020-041-UK R5...
Page 9
Make sure the connectors are correct positioned and fully connected. Place the adapter cable wires inside the con- troller. Place the flex cable inside the controller. Mount the keypad again. CenterLine 230BP; Müller SPRAYDOS Installation Manual 020-041-UK R5...
Page 10
Ground (31) BATTERY CABLE (OPTION): If a power connector (Socket) isn't available in the tractor cabin, a optional battery cable can be used (PN 96ET14). CenterLine 230BP; Müller SPRAYDOS Installation Manual CenterLine 230BP; Müller SPRAYDOS Installation Manual 020-041-UK R5 020-041-UK R5...
Set the Master switch on • Observe that all sections and the master valve open. Check in the 'Boom Section Control Screen' that the section icons turn off and on according to the valve/ switch status. CenterLine 230BP; Müller SPRAYDOS Installation Manual 020-041-UK R5...