Redback RB4 5KVA Manual page 2

Hide thumbs Also See for RB4 5KVA:
Table of Contents

Advertisement

REDBACK QUICK SETUP GUIDE
Oil/
Service/
Air
Filter access
1.
Using
the screwdriver provided loosen
2.
Unscrew
the
oil
filler
3.
Using
the
oil
container provided fill your
4.
Refit
the
oil
filler
cap
S.
Refit
the
access panel, using the screwdriver provided
6.
Unscrew
the
fuel cap
1.
Using
the
screwdriver provided loosen
2.
Locate
and
connect
3.
Refit
the
access panel, using the screwdriver provided tighten
STARTING YOUR REDBACK GENERATOR
4.
Ensure
the
fuel tap located to
Note: Switch
the
fuel
tap
Running In period:
To
poll rope
inside
the
Oil /
30 minutes.
You
can
now
hours. After 20
hours,
the first service must be done. See maintenance schedule.
Remove Start (optional): Ensure the remote switch situated on
position. On the remote
starts.
Press
the blue button
panel
the
cap
and
remove.
generator
and tighten
until
finger
and
fill with unleaded 95+ petrol then refit
connectors
Battery
the
the 2 white
connectors
the
left
of
the
to
the
"off" position when your generator
start
the
generator for
the first
Service/
Air
T-liter
access panel.
use
the key
start
function
control,
press
the
grey 'start' button once then immediately press and hold
to
stop.
2 screws
and
open
the
oil /
up with
450ml
SAE
tight.
tighten
the
2
fuel
screw and open
the
battery
inside
the
battery
access
the
screw.
battery
access
panel
is
time it
is
best
to
use
Once
it
has
started
for
starting
your generator. Do
the
control
service
/air
filter
access
10W30
oil.
screws.
cap.
access
panel.
panel.
is
set
to
the "on"
position.
not
in
use.
the
pull
rope. There
is
with the poll rope let the generator
not
exceed 2500
panel of your generator
panel.
a
choke lever
for
the
run
for
watts
for
the
first
20
is
in
the
'on'
until
the
generator

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Redback RB4 5KVA

Table of Contents

Save PDF