Wiring:

to motor
to magnet
switches
Notes:
- Run 120 VAC power lines as per building code
- Run low voltage wires to/from any input/outputs such as buttons or strikes
- Power is to be connected by authorized electrician to local codes
- Once power is hooked up the unit can be test cycled by pressing "ACT"
- Ensure that operator is working properly before adding inputs/outputs
- Magnets must be properly positioned in order for operator to function (see setting the magnets)
- Full open position is limited by an internal stop not the magnets
- The magnets confirm the door position to the control board
- Magnets can be adjusted to change the point where the door slows for back check and latch
- Use a jumper wire to hold operator in full open position to attach arm.
Have certified Electrician to do installation ONLY!
-
Have certified Electrician to hook the wire into the power side properly.
-
Add the L1, N, and G labels on the wires before installing the system.
-
Test & Hold Open:
O M E G A
control board
120 VAC
to be connected
authorized electrician
press ACT to test
A U T O M A T I C S
on/off
switch
by
use jumper wire
from COM
to ACT 1
to hold open
2 0 1 8
V 2 . 0