Evolution
Series
6" Furniture Feed Poke-Thru Devices
I N S T
L L
T I O N I N S T R U C T I O N S
nstallation nstruction No.: 1 007 155 R2 – Updated May 2010
Products Covered: 6 TCFF, 6STC, 6CFFTC, 15FFH , 152CH , CE6 TCFF
C UTION DO NOT operate tile stripper, cleaning, or resurfacing equipment over top of covers. This may result in
damage to the surface finish of the product.
Suitable for use in air handling spaces in accordance with Sec. 300-22 (C) of the National Electrical Code.
FLOOR PREP R TIONS
Step 1 Layout and locate position of hole(s).
C UTION: Minimum spacing of 2ft on center and not more than
one device per each 65 square feet of floor area in
each span.
24" [610mm] Min
Center – Center
C UTION: Be certain to locate hole at least 6" [152mm] from any wall or
pillar to leave enough room for Poke-Thru cover assembly.
Step 3 Create core hole according to the
dimensions provided in the chart.
Wiremold electrical systems conform to and should be properly
grounded in compliance with requirements of the current National
Electrical Code or codes administered by local authorities.
ll electrical products may present a possible shock or fire
hazard if improperly installed or used. Wiremold electrical products may
bear the mark as UL Listed and/or Classified and should
be installed in conformance with current local and/or the National
Electrical Code.
IMPORT NT: Please read all instructions
before beginning.
Step 2 Remove 7 1/4" dia. [166mm] section from
carpet or tile. Use template provided.
FLOOR
TYPE
Covered Floors
(Carpet, Tile or
Wood)
Bare Concrete
or Terrazzo
1
7 1/4"
[166mm]
CORE
CORE
SIZE (Min.)
SIZE (Max.)
6"
[152mm]
6 1/8"
6 1/16" [154mm]
6 1/8"
[156mm]
[156mm]

Advertisement

loading
Need help?

Need help?

Do you have a question about the Evolution ATCFF and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for LEGRAND Evolution ATCFF

  • Page 1 Wiremold electrical systems conform to and should be properly grounded in compliance with requirements of the current National Electrical Code or codes administered by local authorities. ll electrical products may present a possible shock or fire hazard if improperly installed or used. Wiremold electrical products may bear the mark as UL Listed and/or Classified and should be installed in conformance with current local and/or the National Electrical Code.
  • Page 2 INST LLING COMPLETE SSEMBLY Step 1 Place appropriate gasket Step 2 Remove cover plates by Step 3 Remove 3/4" plug from small removing (5) 8-32 screws. cover plate by rotating counter- around Poke Thru and clockwise using a large straight slide under flange.
  • Page 3 Step 6 Orient Poke Thru so that the three channels span across the corrugations of the deck. Push Poke-Thru into floor. Device openings must span across deck C UTION: Cover must be removed to rotate Poke Thru once it has been installed in the floor. Step 7 Installation complete.
  • Page 4 INST LLING STEM SSEMBLY ND SEP R TE COVER Step 1 Orient Stem ssembly such that the three channels span across the corrugations of the deck. Insert Stem ssembly into core hole. Device openings must span across deck C UTION: Cover must be removed to rotate Poke Thru once it has been installed in the floor. Step 2 Remove disposable plate and (2) plate clips by removing the 8-32 screws.
  • Page 5 CONFIGURING FEED PL TES Step 1 Remove cover assembly from Poke Thru by Step 2 Remove Poke Thru from floor by bending removing (2) 8-32 screws and lifting cover off. tabs inward and pulling unit up. Step 4 Use (4) 8-32 screws to install new feed plate Step 3 Remove (4) 8-32 screws and pull off or housing.
  • Page 6 Evolution Series Poke-Thru Devices are UL Listed and Classified to U.S. and Canadian safety standards to the following conditions: The 6STC Poke-Thru Stem with the 6CFFTC Service Head Fitting, and the 6 TCFF factory assembled Poke-Thru device are for use with 1-, 1 1/2 -, or 2- hour rated unprotected reinforced concrete floors and 1-, 1 1/2 -, or 2- hour rated floors employing unprotected steel floor units and concrete topping (D900 Series Designs), or concrete floors with suspended ceilings.
  • Page 8 Carpet Cutout Template Carpet Cutout 6 1/2" [166mm] Core Hole (See chart below for Core Hole dimensions.) C UTION: When printing copies of this FLOOR CORE CORE template please be sure template TYPE SIZE (Min.) SIZE (Max.) is scaled correctly and is the correct size once it is printed.

This manual is also suitable for:

Evolution 6stcEvolution seriesEvolution 6cfftcEvolution 15ffhaEvolution 152chaEvolution ce6atcff