Prepare The Installation Site; Site Preparation - Horizon Fitness HCC Installation Instructions Manual

With ride technology; for harmony or 110cm symphony plus applications
Table of Contents

Advertisement

Prepare the installation site.

Provide drainage, water supply and electrical power to within 6 feet (2m)
of ice machine in accordance with local and national codes. Outdoor
installation is not recommended and will void warranty.
2.1
2.1
Installation site requirements
1/4" (6,4mm)
Electrical
• H_C1000(A/W)HS 208-230/60/1-15 amps
• H_E1000(A/W)HS 230/50/1-15 amps
(H_E1000A/W requires 15A circuit, 1.50 mm
‡ Plug must be provided by end user & must conform to standard EN 60 335-2-24 of the end destination.
Potable water supply
• 10-70 psi (69-483kpa)
• 45 to 90 F (7 to 32 C)
• Follett recommends the use of an in-line water filtration system (#00130286)
Condenser water supply for water-cooled systems
• 10 psi min.; 150 psi max. (69kpa min.; 1034kpa max.)
• 45 to 90 F (7 to 32 C)
• 1.5 gallons per minute (5.68 liters per minute)
Drain
• The drain line from the ice machine must have at least 1/4" per foot pitch (6,4mm/0,3m)
HARMONY and Symphony Plus • RIDE Technology
1' (0,3m)
wire)
2

Site preparation

H_E1000A/W
requires 15A circuit,
1.50 mm
2
H_E1400A/W
requires 20A circuit,
4.00 mm
• H_C1400(A/W)HS 208-230/60/1-20 amps
• H_E1400(A/W)HS 230/50/1-20 amps
(H_E1400A/W requires 20A circuit, 4.00 mm
self-contained
H_C1000A/W
NEMA
6-15
H_C1400A/W
NEMA
6-20
wire
2
wire
wire)
2
2
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hme1000whsHme1400whsHmcHceHme1000ahsHme1400ahs

Table of Contents