Download Print this page

Telpro Cabinetizer 76 Operator's Manual

Advertisement

Quick Links

World's Best
Cabinet Lifts
®
by
O P E R A T O R ' S M A N U A L
For Model 76
(Note: In this manual, the Cabinetizer
is shown with the optional Drill Drive
winch assembly)
TM
TM
WARNING
Re ad and b e c o me f a mi lia r wit h t his m an ual B EFO R E oper ating unit.
Before operating this equipment, thoroughly read this set of instructions, make sure you
understand them, and only then follow the step-by-step directions. Failure to do so could
result in serious property damage and / or serious bodily injury.
®
MADE BY
www.telproinc.com
© 2012 Telpro Inc. All Rights Reserved.
Form 42-26-00-00 version 1.5

Advertisement

loading
Need help?

Need help?

Do you have a question about the Cabinetizer 76 and is the answer not in the manual?

Questions and answers

Summary of Contents for Telpro Cabinetizer 76

  • Page 1 Failure to do so could result in serious property damage and / or serious bodily injury. ® MADE BY www.telproinc.com © 2012 Telpro Inc. All Rights Reserved. Form 42-26-00-00 version 1.5...
  • Page 2 Always keep the load lowered until the lift is in place beneath the space in which the cabinets will be installed. Questions? - Call Telpro Inc. Customer Service at 1-800-448-0822 or 1-800-441-0551...
  • Page 3: User Components

    USER COMPONENTS Collar Assembly Dolly Base Counter Base 2 Piece Split Boom Top Roller Assembly Split Boom Connector Maintaining your Cabinetizer Store the Cabinetizer Cabinet Lifter in a dry place. Lightly lubricate caster bearings, base brake assembly, and top boom rollers. Take reasonable care to avoid damaging the Cabinetizer Cabinet Lifter when transporting it.
  • Page 4 ASSEMBLY - Dolly Base Configuration Make sure corner holes are up. Align set screws with access holes. 4. Insert the split boon connector. Align the set screws with the access holes in the boom tube 1. Install either of the boom sections into the dolly base.
  • Page 5 ASSEMBLY - Counter Base Configuration 1. Install either of the boom sections into the Counter 4. Insert the top roller assembly Base. 5. Position the strap over the top rollers, making sure that 2. Tighten the thumb screws on the Counter Base to it is aligned straight with no twists.
  • Page 6 INSTALLING UPPER CABINETS INSTALLING UPPER CABINETS (before base cabinets) (over existing base cabinets) Using the Counter Base Using the Dolly Base Configuration (p. 4) to install Configuration (p. 3) to install upper cabinets second (when upper cabinets first (before base cabinets are in place). base cabinets are in place).