Download Print this page

IBC P-242 Installation Instructions

Installing a v-10 touchscreen controller

Advertisement

Quick Links

P-242 Installing a V-10 touchscreen controller
IBC Part #
P-242
V-10 touchscreen controller installment kit
Danger
Installing and servicing boiler equipment, parts and accessories can be hazardous due to gas and electrical
components. Only trained personnel should install or service heating equipment. When working on boiler
equipment, observe precautions in the literature, on tags, and on labels attached to the unit.
For your safety, turn off electrical power supply at service panel and allow unit to cool before proceeding. Failure
to do so can cause severe personal injury or death. The ability to properly perform service on this equipment
requires certain expertise, mechanical skills, tools, and equipment. If you do not possess these, do not attempt
to perform any service on this equipment. Failure to follow this warning could result in possible damage to this
equipment, serious personal injury, or death.
Kit contents
1 x Touchscreen boiler controller - 500-044
1 x Control Cover - 250-591
1 x Wiring Diagram Label - 080-123
1 x Touchscreen manual - 120-198
Replacing a controller with the V-10 touchscreen controller requires the following:
1. Removing the old controller.
2. Installing the new touchscreen controller.
3. Wiring the touchscreen controller.
4. Programming and testing connections.
|
120-199-R3
5/16/2018
Installation Instructions
Description
www.ibcboiler.com
Boiler Model
All SL models
VFC Series: VFC 15-150,
VFC 45-225
1

Advertisement

loading

Summary of Contents for IBC P-242

  • Page 1 Installation Instructions P-242 Installing a V-10 touchscreen controller IBC Part # Description Boiler Model P-242 V-10 touchscreen controller installment kit All SL models VFC Series: VFC 15-150, VFC 45-225 Danger Installing and servicing boiler equipment, parts and accessories can be hazardous due to gas and electrical components.
  • Page 2 7. Lift up on the bottom-left corner of the controller 5. From the right side of the IBC board, unplug the and pull forward, removing the controller from orange and green terminal block connectors. the boiler.
  • Page 3 2. Remove the five Phillips screws (see Figure 2). board. You will need to do this for both boards, starting 6. For older IBC boiler models: with the old controller first. a. Remove the front cover from the new controller.
  • Page 4 Do not tap the "Start" terminal block on the new controller. button to run the "Self Test". This is for IBC staff use only. Note If you the select the "Start button the The new controller requires the Therm. 1,...
  • Page 5 V-10 Touchscreen controller - Electrical wiring diagram...