Download Print this page

Tantalus ITRON SENTINEL TUNet PP-1316 Install Manual page 11

Meter reader

Advertisement

7.
Situate the PP-1316 module within the cavity inside the display housing. Ensure that the clip
on the top of the display housing is used to lock down the PP-1316 module.
8.
Ensure that the coaxial cable falls within the hole on the side of the display housing.
9.
Snap the display housing back on the base of the meter. Ensure that all four outer snaps are
engaged.
TUNet PP-1316 Install Guide
Doc No. KT-109967
page 7

Hide quick links:

Advertisement

loading