Download Print this page

GE RAK3152 Installation Instructions page 2

Power supply kit for cord or direct connection
Hide thumbs Also See for RAK3152:

Advertisement

FOR 230/208 VOLT POWER CORD CONNECTIONS ONLY
FOR 5200 AND 5500 SERIES MODELS ONLY
1. Remove the room cabinet by pulling it out at the bottom
to release it (1); then lift it up to clear the rail along the
unit top (2).
2. Insert the plug into the socket located in the wiring
compartment, making sure the plug is firmly seated
and the latches secure the connector assembly.
Strain
relief
Plug into
building
receptacle
3. Position the cord and install the strain relief and screw
as shown.
4. Reinstall the room cabinet front by positioning on the
top brackets and securing the sides to the unit.
5. Install the attachment plug cap into the wall
receptacle and check the Zoneline operation.
Yellow plug
to chassis
connector
Screw
Cord
FOR 7500 SERIES MODELS ONLY
1. Remove the front panel by removing the filter, taking
out the four front screws, the upper two screws from
the top of the panel, and the shipping screws on each
side, if present. (Discard the two side shipping screws,
if present.)
Side
shipping
screw
2. Remove the junction box cover and the junction box
and discard.
Remove
junction
box and
cover
3. Connect the power cord, with a loop, through the
strain relief.
4. Replace the case front panel by replacing the four
front screws and the two top screws. Replace the
filter.
2
Side
shipping
screw
Strain relief
IMPORTANT:
Power cord
must have a
loop.

Advertisement

loading

This manual is also suitable for:

Rak3302Rak3202