Advertisement

Userguide HR/HRE series Eng
HRE-CH
HR-CH
HR–Calorifier
HR-Combi
~ 1 ~

Advertisement

Table of Contents
loading

Summary of Contents for Kabola HR Series

  • Page 1: Preface

    Userguide HR/HRE series Eng HRE-CH HR-CH HR–Calorifier HR-Combi ~ 1 ~...
  • Page 2 Warning: Chance of (life-threatening) injuries You can contact Kabola Heating Systems should you have any remarks, wishes or in the case of any shortcomings. Any suggestion for the improvement of the manual are also always welcome. We wish you every pleasure with your purchase.
  • Page 3: Table Of Contents

    Table of contents Preface Table of contents 1 Introduction 1.1 General 1.2 Range of application 1.3 Product description 1.4 Technical specifications 2 Safety 2.1 General safety 2.2 Safety instructions 3 Transport and storage 3.1 Transport 3.2 Storage 4 Installing and preparing for first use 4.1 Installation 4.1.1 Fitting the boiler 4.1.2 Connection to the central heating system...
  • Page 4: Introduction

    1.1 General This user manual is intended for both the installer and the end user of the Kabola HR or HRE heating boiler. There is a wide range of HR/ HRE heating boilers with a broad range of applications. With this purchase you obtain a product of the highest quality due to the practical application of the latest European standards and directives and modern technologies.
  • Page 5: Safety

    Kabola Heating Systems! 2.2 Safety instructions The safety instructions specified below must be followed when using the Kabola boiler. MEASURES FOR SAFE INSTALLATION  Do not place any flammable and/or gaseous substances that may cause danger of explosion or fire in the space where the boiler is or is to be installed.
  • Page 6: Transport And Storage

    3 Transport and storage 3.1 Transport Take the following measures before the boiler is transported:  Drain off the boiler water.  Disconnect the fuel system.  Disassemble the burner if required (see § 4.1.6, burner assembly). During the transport of the boiler the following points must be observed: ...
  • Page 7: Installing And Preparing For First Use

    4 Installation and bringing into use In this section you can find instruction and tips for the correct placing and connection of the boiler and the associated equipment. Warning: Do not place any flammable and/or gaseous substances that may cause danger of explosion or fire in the space where the boiler is or is to be installed.
  • Page 8: Connection Of Domestic Hot Water Supply

    5. The letters B and A are market on the 3way valve Note: Fig 2 A boiler vessel thermostat must always be fitted (available from Kabola Heating Systems) HR combi boiler (fig 3) The connection of piping to the HR combi takes place as follows: 1.
  • Page 9: Flue Gas Outlet

    Because in most cases the flue gas temperature is higher than 180 °C, it is the desirable to insulate the outlet with heat-resistant material in places where contact with body parts is possible. These are available from Kabola Heating Systems B.V.
  • Page 10 Tip: Als maatwerk kan Kabola een dekdoorvoer onder een hoek produceren zodat de schoorsteen recht staat. Your Kabola supplier can provide you with all components which may be required for installation such as:  Cowls;  Flexible piping;  Single and double walled chimney pipes;...
  • Page 11: Electrical Connection

    4.1.4 Electrical connection Warning: Disconnect the power supply from the boiler before you start the installation. The quality of 230 VAC power supply to the boiler should be as good as the power supply from a land line. TIP: If you are using an inverter, we recommend a 900W sine wave inverter.
  • Page 12 HR – CH , Calorifier and Combi boiler Connection of the room thermostat and the function warm water on / off For connecting the room thermostat (with the function of hot water on / off) using a 4-wire 0.75 mm² insulated cable.
  • Page 13: Filling The Central Heating System

    If you do not live permanently on board we recommend to fill the heating system with coolant. The cooling liquid must be suitable for heating systems (pH value 8.5). For more information please contact your dealer or Kabola, Netherlands  See manual from the circulation pump.
  • Page 14: Mounting The Oil Filter And Oil Burner

    4.1.7 Connecting of the filter at the oil burner (oil pump) Figure 14 Figure 15 For the connection of the oilfilter the following operations have to be carried out (see figures above ).  Connect the two oil hoses from the burner to the oilfilter Please note that the arrow markings, ensure that the arrow directions of the oil pump and the oil filter match, the flow and return (see figure 14 and 15);...
  • Page 15: Starting Your System

    4.2 Starting your system After the room thermostat is connected, the following steps:  Insert the plug into the grounded socket for 230 volt version.  Switch the boiler on, at the on / off switch on the control panel. The lamp in the switch indicate that the system is on.
  • Page 16: Operating The Boiler

    5. Operating the boiler When the boiler has been started and adjusted according to 4.2, operation fo the boiler is very simple. The required temperature is set with the room thermostat, which controls the boiler. The calorifier thermostat controls the boiler. The operation of the room thermostat is explained in the manual of the room thermostat. If problems arise with the operation of the boiler, you will find a list of possible problems and solutions in Appendix C.
  • Page 17: Explanation Of The Dashboard

    5.1 Explanation of the dashboard Operating panel HR-CH (front) Figure 17 10 Amp fusing High limit thermostat (is found on the back) On/off switch Display|boiler thermostat Explanation of the operating panel Set the boiler temperature to 80 degrees Celsius (press boiler thermostat button in and turn). Numbers Explanation Photo...
  • Page 18 Operating panel HR-Calorifier (front) Figure 18 10 Amp fusing High limit thermostat (is found on the back) On/off switch Display|boiler thermostat Explanation of the operating panel Set the boiler temperature to 80 degrees Celsius (press boiler thermostat button in and turn). Key to the boiler display Numbers Explanation...
  • Page 19 HR- combi boiler Operating panel HR-Combi boiler (front) Figure 19 10 Amp fusing High limit thermostat (is found on the back) On/off switch Display|boiler thermostat Explanation of the operating panel Set the boiler temperature to 80 degrees Celsius (press boiler thermostat button in and turn). Key to the combi boiler display Numbers Explanation...
  • Page 20: Points For Attention

    Replacement parts must be ordered from Kabola Heating Systems. Only original replacement parts may be used for the guarantee to be applicable. Mention the type and serial number when ordering. Kabola Heating Systems can then supply the correct parts. Annex E includes a summary of the parts.
  • Page 22: Appendix B Electrical Diagram 230 V

    Appendix B Electrical diagram 230V HR – HRE - CH...
  • Page 23 Appendix B Electrical diagram 230 V...
  • Page 24: Appendix C Troubleshooting

    Appendix C Troubleshooting Listed below you will find a list with possible problems, their reasons and solutions. When you encounter problems not listed, you should contact your dealer. Never try to solve problems on your own. Problem Possible reason Possible solution Burner will not start Oil supply interrupted Bleed the oil filter...
  • Page 25: Appendix E Boiler Parts

    Appendix E Burnerparts...
  • Page 26: Appendix G Ec Declaration

    Kabola Heating Systems BV Placotiweg 1 4131 NL Vianen (Utr.) The Netherlands declare entirely under our own responsibility that product: Boiler burner Kabola HR – HRE 230 V version to which this declaration relates, conforms with the following standards: 303-1, 303-2,...
  • Page 27: Appendix H Ce Declaration

    Appendix G CE declaration HR 300 HRE 300 HRE 400 HRE 500 HR 500...

This manual is also suitable for:

Hr–calorifierHre seriesHr-combiHre-chHr-ch

Table of Contents