P
M
RODUCT
ANUAL
2.3
P
-I
RE
NSTALLATION
Before installing the Dual Band BDA, review the following safety information:
Follow all local safety regulations when installing the Dual Band BDA.
•
Only qualified personnel are authorized to install and maintain the Dual Band BDA.
•
During normal operation, the Dual Band BDA door should be closed.
•
Some maintenance tasks may require the Dual Band BDA door to be opened while
•
the power is on. In such cases, perform the required tasks carefully and remember
to close the Dual Band BDA cover/door when finished.
Ground the CBDA with the grounding bolt located on the external lower side of the
•
cabinet (see 3.4).
Do not use the grounding bolt to connect external devices.
•
Follow Electro-Static Discharge (ESD) precautions.
•
Before closing the CBDA cover, make sure no wires are in the way.
•
Use low loss cables to connect the antennas to the Dual Band BDA.
•
2.4
I
NSTALLATION
T
HE DUAL BAND BDA MUST ALWAYS BE INSTALLED VERTICALLY AND TOP
-
FREE
FLOW OF COOLING AIR
Use a suitable mounting surface, such as a rigid wall.
•
Follow Electro-Static Discharge (ESD) precautions.
•
Install the Dual Band BDA close to the service area to monitor the output power and
•
noise figure.
Use low loss cables to connect the antennas to the Dual Band BDA.
•
Install the Dual Band BDA in a shielded, ventilated, and easy-to-reach area –
•
preferably at eye level.
Page 12
C
R
OMPACT
EPEATER
S
AFETY
L
, E
OCATION
WARNING
. H
ORIZONTAL INSTALLATION ON A BENCH FOR LONG TIME MAY CAUSE
DAMAGE TO THE DUAL BAND BDA DUE TO OVER
Proprietary Data
D
3178B
D
EKO
I
NSTRUCTIONS
NVIRONMENT AND
-
HEATING
W
L
.
EKOLINK
IRELESS
TD
C
ABLES
-
,
DOWN
TO ALLOW
.
Pub. 300TC80031 Rev. 1.55