Carrier 09DK Series Installation, Start-Up And Service Instructions Manual page 15

Air-cooled condenser units 50/60 hz
Table of Contents

Advertisement

09DK044 40/13/13/34% Circuiting Modification — To con-
figure the 09DK044 for four refrigerant circuits (one with
40% capacity, two with 13% capacity, and one with 30%
capacity) using field supplied parts, perform the following
steps:
1. Remove all plastic caps. Refer to Fig. 17.
2. Attach following parts as shown in Fig. 17. Perform
phos-copper brazing on all field-made connections
while protecting adjacent joints from heat.
a. Plug the open 1
1
/
each of the large gas headers as shown in Fig. 17,
Item A. Parts required:
2 — 1
1
/
-in. plug fittings
8
-in. stub tubes at the inside of
8
PLASTIC CAPS REMOVED FROM UNIT
FIELD-SUPPLIED PARTS ADDED TO UNIT
Fig. 17 — 09DK044 Unit with 40/13/13/34% Circuiting
b. Plug the open
each of the large gas headers as shown in Fig. 17,
Item B. Parts required:
2 —
/
-in. plug fittings
5
8
3. Install or replace filter drier(s). Before charging the
system, install or replace filter drier(s) connected to
the liquid line near the indoor unit to prevent contami-
nation in the system.
A
B
15
5
/
-in. stub tubes at the inside of
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

09dk02009dk02409dk02809dk04409dk034

Table of Contents