Download Print this page

Fuse Installation - Quanser AMPAQ-L2 User Manual

Advertisement

Caution: Do not use the cables provided with the AMPAQ L2/L4 to wire it to experiments that use a different
amplifier module, such as the Quanser Rotary (SRV02) or Linear (IP02) products, as this will result
in burning the motors. The AMPAQ L2/L4 can be used with such experiments only if plant specific
cables are available.

4 FUSE INSTALLATION

The AMPAQ L2/L4 has a single 3AG, 250V, 5A fuse that protect the amplifier from overcurrent through the main
power connector.
Caution: Make sure the power to the amplifier is disconnected before changing the fuse!
Follow this procedure to install or replace the fuses in the AMPAQ:
1. The fuse holder is located at the rear of the unit, as shown in Figure 2.1.
2. Make sure the amplifier power cable is disconnected.
3. Remove the fuse holder. To do this, push and twist the knob counter-clockwise (CCW) and pull the fuse holder
out as illustrated in Figure 4.1.
4. As shown in Figure 4.2, remove the old fuse from the holder and insert the new one.
5. Install the fuse holders back into the amplifier. Push the fuse holder back into panel and twist the knob clock-
wise until secure.
Caution: Installing the wrong fuse rating may result in damage to your amplifier.
6. Connect the power cable to the back of the amplifier.
Figure 4.1: Remove fuse holders
Figure 4.2: Replacing fuse in the fuse holder
AMPAQ L2/L4 User Manual
8

Advertisement

loading

This manual is also suitable for:

Ampaq-l4