1.10 Unpacking
No.
Earth1006 Remote Monitoring
1
2
3
4
5
Stainless steel hoop
6
7
Operation manual
8
After unpacking, please check carefully according to above list. The
specific quantity shall be consistent with the customer order contract. If
there is damage, loss, shortage or discrepancies of accessories, please
contact the manufacturer in time.
1.11 Boot operation
After receiving the product, please connect different interface sensor,
with more than 8s magnet induction magnetic control buttons, powered
on, the screen lit, entered the work flow, subsequent parameters
configuration can be remote, as shown in the device configuration.
Table 1.2 packing list
Item
Terminal
Magnetic bar
Hanging bracket
Expansion screw
Configuration line
Certification
Qty.
1 set
1pc
1set
3pairs
2pcs
1pc
1pc
1pc
7
Remark
Including fixed bolt
Wall mounted
Stud mounted
1pc for each batch
Need help?
Do you have a question about the Earth1006 and is the answer not in the manual?