When planning a bench layout:
Examples are provided here for systems including a GC with an ALS, computer and printer.
Most examples also include an MS.
See several example layouts below.
Site Preparation Guide
Consider component dimensions, weights, and space requirements. See
Weight"
on page 18.
Consider the lengths of cables and hoses for connection of components. See
Length of Cables and Hoses"
For systems that include an MS, consider foreline pump requirements. See
Pump Requirements for Systems Including an MSD"
Allow space for operational access.
Note that the 7200 Q-TOF requires 48 cm (1.6 ft) of space in front to allow for the RIS
probe extraction tool handle when installed.
Note that some repairs to the GC/MS, or to the GC itself, will require access to the back of
the instrument(s).
on page 10.
on page 20.
"Dimensions and
"Maximum
"Foreline