iHeat Roof Mount Solar Hot Water Systems Installation Manual page 8

Table of Contents

Advertisement

SECTION 2
5
6
Provision for stainless steel nut and bold.
To be placed through base and stainless strap
Installation Manual - Roof Mount Solar Hot Water - August 2017
Place tank into position, resting the front leg of the base
against the top of the panels. Ensure the centre of the
base is centre of the panels. Tank connections are left
hand only.
TIP: Utilise the centre hole on the base to accurately
position the tank dead centre.
Utilising the 2 stainless steel straps bent at 90 degrees,
insert bolt through the smaller round provisions then
place stainless steel strap through bolt and tighten with
provided nut. Repeat this step for both provisions on
left and right hand side of the base. Then screw the
strap to tin roof through existing batten screw. For tile
roof, strap is be screwed into the truss and then tile re-
seated.
1300 829 118
i-heat.com.au

Advertisement

Table of Contents
loading

Related Products for iHeat Roof Mount Solar Hot Water Systems

Table of Contents